Prototype by Consul, Inc. for NHDES RFP DES 2026-23. Not an official NHDES website.
Marlborough, Cheshire County
Downtown Stormwater Planning Phase 2
Funding recipient: Marlborough
What the funding paid for
This project is a continuation of the Planning & Evaluation Project completed July 2023. The project will allow for the revaluation of work done this far, with some rework to bring the upper bypass to final design and to develop 30% design phase engineering for the lower system. Considerations of both structural and non-structural stormwater control methods will be evaluated. During Phase 2 the intent is to evaluate green infrastructure opportunities in both the proposed project's upper and lower portions.
Funding
$225,000
- Clean Water State Revolving Fund: $225,000
- Commitment date: Aug. 30, 2024
- Project type: Planning
- Water system: Stormwater
- Project number: 189-05
- Location: Approximate
- Record source: EPA public records
All New Hampshire projects · User guide · Presentation · The multistate Water Funding Explorer