Nashua, Hillsborough County

Wastewater Treatment Facility Dry Well Valve Replacement

Funding recipient: Nashua

What the funding paid for

The project includes replacement or rebuild of four large raw sewage pumps in a dry well at the wastewater plant, originally installed in 1972. A Facility Plan completed in 2021 confirmed that the valves are at the end of their useful life and need to be replaced and/or rebuilt. In addition, the study determined that replacing the interior steel pipe force main in the dry well is warranted based on age of pipe. Further upgrades to the influent wet well, such as tank coating and gate replacement, are also planned.

Funding

$6,900,000