Wyoming
Where the state’s revolving fund money for water went, project by project.
$321 million committed to 117 drinking water and clean water projects.
- Drinking water: $131 million
- Clean water: $190 million
- Grants and forgiven principal: $56.7 million
- Latest agreement: June 27, 2025
The 25 largest projects
- Waste Water Treatment Plant Facility Replacement- Construction Loan: Green River, City of. $45.1 million, clean water. May 21, 2020. The City of Green River is rehabbing their entire waste water treatment plant. Converting it from a lagoon system to a full treatment plant.
- Multi Year Rehab of Sewer Lines, Storm Water, and Sewer Lagoon Headworks Addition: Lander, City of. $28.1 million, clean water, $4.4 million in grants and forgiven principal. Nov. 20, 2024. This project will replace, or repair failed or failing water & sewer lines. The improvement project includes replacing critical water transmission & distribution mains within the roadway. Sewer mains will be replaced…
- Multi Year Rehab of Water Transmission and Distribution Lines: Lander, City of, Lander. $16.9 million, drinking water, $4.2 million in grants and forgiven principal. Nov. 20, 2024. The multi year project includes replacing the water transmission and distribution lines in the following streets: 1.5 miles in Baldwin Creek, 2.5 miles in Fifth Street, 2 miles in Buena Vista, 2 miles in Cascade, 1.5…
- WWTP Phase II: Gillette, City of. $15.0 million, clean water. March 6, 2025. In the 2019 Wastewater Treatment Facility Condition Assessment, the City of Gillette has identified the need for several major replacement and improvement projects within the Wastewater Treatment Facility. These…
- North Side Tank Project: Laramie, City of, Laramie. $10.4 million, drinking water, $508,000 in grants and forgiven principal. July 17, 2017. The project includes the construction of a 1 MG treated storage tank along with updating distribution lines from the tank to the north end of town.
- Madison Water Transmission Main Pipeline Repair: Gillette, City of, Gillette. $10.0 million, drinking water. June 27, 2025. The City of Gillette has identified the need to rehabilitate and replace a section or sections of the 30- lnch Gillette Madison pipeline which ruptured due to an over pressurization event on May 4, 2021. The project is…
- North Platte Sanitary Sewer Rehabilitation: Casper, City of. $7.9 million, clean water, $2.0 million in grants and forgiven principal. March 5, 2020. Perform drop connection improvements, manhole rehabilitation, and pipeline rehabilitation.
- Wasatewater Treatment Plant: Sheridan, City of. $7.8 million, clean water. July 26, 2024. Wastewater Treatment Plant rehabilitation and upgrades of entire plant
- CHEYENNE HYDRO-ELECTRIC GENERATION FACILITY PROJECT: Cheyenne, City of, Cheyenne. $7.4 million, drinking water, $750,000 in grants and forgiven principal. Jan. 11, 2013. Engineering services, construction, installation of a hydro-electric generating facility.
- Wastewater Treatment Plant Modifictions: Torrington, City of. $7.0 million, clean water, $630,000 in grants and forgiven principal. March 2, 2021. Pretreatment facility, lift station upgrades, controls, flow metering, bypass pump, vactor truck receiving station, PLC controls, and SCADA interface
- Landfill Cell Closure and Permanent Cap: Sheridan, City of. $5.8 million, clean water, $1.1 million in grants and forgiven principal. Dec. 30, 2019. Final cover design, permitting, and install of geosynthetic cover for Cell 9.
- Phase II Utility Improvements-Complete Water Distribution System Replacement: Lusk, Town of, Lusk. $5.5 million, drinking water, $4.1 million in grants and forgiven principal. Sept. 28, 2021. Replace all of the old leaking water lines, meter system, and adding looping lines to eliminate dead ends.
- Water Lines Replacement Phase 1-3: Upton, Town of, Upton. $5.1 million, drinking water, $2.6 million in grants and forgiven principal. July 10, 2024. The replacement of water mains that are past their useful life made up of old AC pipe. This replacement project affects eight different streets aas long as the funding can complete all work as planned.
- North City Zone Improvements: Cheyenne, City of, Cheyenne. $4.8 million, drinking water. June 9, 2020. Construct a 3 million gallon elevated storage tank. This will replace to old out of date storage tanks and pumping stations.
- LUST Loan #28-Population Greater than 10,000: Wyoming DEQ. $4.5 million, clean water. Dec. 11, 2023. Loan #28 to DEQ for the Leaking Underground Storage Tank program.
- Leaking underground storage tanks: Wyoming DEQ. $4.3 million, clean water. Dec. 9, 2020. Wyoming DEQ remediates areas with its Leaking Underground Storage Tank Program statewide at scores of different sites.
- WWTP Improvements Project: Teton Village Water & Sewer District. $4.2 million, clean water. Jan. 14, 2022. The Teton Village WWTP 2022 Improvements consist of the construction of an additional clarifier, an additional aerobic digester, expansion of the~ flow equalization facilities, new chlorination and lime feeder…
- Sewer and Storm Water Replacement Phase 1-3: Upton, Town of. $4.1 million, clean water, $2.1 million in grants and forgiven principal. July 10, 2024. Rehabilitation of sewer collection lines in various street throughout the Town
- Leaking underground storage tanks: Wyoming DEQ. $4.1 million, clean water. Dec. 9, 2020. Wyoming DEQ remediates areas with its Leaking Underground Storage Tank Program statewide at scores of different sites.
- 2019 Water Improvement Project: Star Valley Ranch, Town of, Star Valley Ranch. $4.1 million, drinking water, $1.0 million in grants and forgiven principal. Aug. 20, 2018. This is the third phase of the Town replacing old, deteriorated, and undersized mains and distribution lines. This phase they are replacing 40,000 liner feet of lines.
- Phase II of Utility Improvements- Major Sewer Rehab: Lusk, Town of. $4.0 million, clean water, $3.0 million in grants and forgiven principal. Sept. 28, 2021. The Town is replacing all of the sewer lines and manholes in the Town. This loan id for the second phase of this sewer rehab.
- Sheridan Main Street Dow to Burkitt Project: Sheridan, City of, Sheridan. $4.0 million, drinking water. Oct. 24, 2022. Installation of approximately 6,000 feet of 12 inch potable water main and replacement of existing services from Dow Street to Burkitt Street.
- LUST Loan #28-Population Less than 3,500: Wyoming DEQ. $3.7 million, clean water. Dec. 11, 2023. Loan #28 to DEQ for the Leaking Underground Storage Tank program.
- DEQ Loan #27 Leaking Under Ground Storage Tank: Wyoming DEQ. $3.5 million, clean water. April 14, 2023. Wyoming DEQ remediates areas with its Leaking Underground Storage Tank Program statewide at scores of different sites.
- Northern Expansion (NorthEnd) Project: Northwest Rural Water District, Cody. $3.5 million, drinking water, $1.8 million in grants and forgiven principal. Aug. 5, 2013. Transmission and distribution
Counties that received the most
- Fremont: $53.8 million
- Sheridan: $36.7 million
- Natrona: $31.4 million
- Campbell: $25.4 million
- Laramie: $14.4 million
- Goshen: $12.4 million
- Weston: $12.4 million
- Niobrara: $11.2 million
- Albany: $10.4 million
- Sublette: $8.9 million