Washington
Where the state’s revolving fund money for water went, project by project.
$1.6 billion committed to 378 drinking water and clean water projects.
- Drinking water: $281 million
- Clean water: $1.4 billion
- Grants and forgiven principal: $190 million
- Latest agreement: June 30, 2025
The 25 largest projects
- Georgetown Wet Weather Treatment Station: King County Dept. of Nat. Resources and Parks. $94.7 million, clean water. March 6, 2023. The project improves water quality in the Lower Duwamish through the construction of a wet-weather treatment station, conveyance pipelines, and an outfall structure to convey and treat combined sewage prior to…
- Ship Canal Water Quality Project: Seattle Public Utilities. $66.0 million, clean water. June 18, 2021. This project protects water quality with the construction of an offline 18-ft 10-inch inside-diameter storage tunnel and pump station; 5 access shafts; and a 649 foot long 94-inch inside diameter tunnel under the ship…
- Ship Canal Water Quality Project, Construction: King County Dept. of Nat. Resources and Parks. $66.0 million, clean water. June 18, 2021. This project protects water quality with the construction of an offline 18-ft 10-inch inside-diameter storage tunnel and pump station; 5 access shafts; and a 649 foot long 94-inch inside diameter tunnel under the ship…
- Ship Canal Water Quality Project: Seattle Public Utilities. $59.0 million, clean water. June 22, 2022. This project protects water quality with the construction of an offline 18-ft 10-inch inside-diameter storage tunnel and pump station; 5 access shafts; and a 649 foot long 94-inch inside diameter tunnel under the ship…
- West Duwamish CSO Control Project: King County Dept. of Nat. Resources and Parks. $43.9 million, clean water. June 30, 2025. This project will improve water quality in the Duwamish River through the construction for storage of untreated wastewater discharges, and conveyance of stored wastewater to the West Point Wastewater Treatment Plant in…
- Georgetown Wet Weather Treatment Station: King County Dept. of Nat. Resources and Parks. $43.0 million, clean water. June 22, 2022. The project improves water quality in the Lower Duwamish through the construction of a wet-weather treatment station, conveyance pipelines, and an outfall structure to convey and treat combined sewage prior to…
- PWRF PH2 - Winter Storage Ponds: Pasco, City of. $34.9 million, clean water. April 1, 2024. This project improves water quality in the Columbia River through the construction of wastewater treatment facilities at the Pasco Process Water Reuse Facility (PWRF) in the City of Pasco. Benefits include increased…
- Granite Falls WWTP Upgrade: Granite Falls city of. $34.2 million, clean water. Dec. 15, 2023. This project has proposed improvements to the Granite Falls Wastewater Treatment Plant (WWTP) to improve water quality in the Pilchuck River and to serve the City through 2038. The proposed project will construct the…
- Construction of Ferndale Wastewater Treatment Plant (WWTP) Upgrade: Ferndale, City of. $33.1 million, clean water. March 16, 2019. This project improves water quality in the Nooksack River by upgrading the existing wastewater treatment facility in the City of Ferndale. The upgrades are needed to address aging equipment, future flow and loading…
- City of Yelm Water Reclamation Facility Modifications: Yelm, City of. $31.6 million, clean water. June 22, 2022. This project improves water quality through the construction of wastewater treatment facilities at the City of Yelm. This project increases capacity.
- Kennewick WWTP Phase 2: Kennewick, City of. $29.1 million, clean water, $6.1 million in grants and forgiven principal. June 30, 2023. This project improves water quality in the Columbia River through the design and construction of wastewater treatment facilities at the wastewater treatment plant in the City of Kennewick. This project improves…
- City of Pasco WWTP Phase 2A & 2B: Outfall Replacement & Plant Improvements: Pasco, City of. $26.5 million, clean water, $192,000 in grants and forgiven principal. April 5, 2024. This project improves water quality in the Columbia River through the construction of wastewater treatment facilities at the Pasco municipal Wastewater Treatment Plant (WWTP) in the City of Pasco. Benefits include,…
- Ship Canal Water Quality Project, Construction: King County Dept. of Nat. Resources and Parks. $26.0 million, clean water. March 6, 2023. This project protects water quality with the construction of an offline 18-ft 10-inch inside-diameter storage tunnel and pump station; 5 access shafts; and a 649 foot long 94-inch inside diameter tunnel under the ship…
- College Place WWTP Construction: College Place city of. $26.0 million, clean water, $10.0 million in grants and forgiven principal. May 25, 2023. This project improves water quality in Garrison Creek and the Walla Walla River through construction of wastewater facility upgrades at the College Place WWTP and rehabilitation of collection systems in College Place…
- Sultan Wastewater Treatment Facility (WWTF) Upgrade: Sultan city of. $25.6 million, clean water. July 1, 2022. This project improves water quality in the Skykomish River through the construction of wastewater treatment facilities at the existing wastewater Treatment Plant (WWTP) in the City of Sultan. This project will increase…
- Ship Canal Water QualityProject: Seattle Public Utilities. $23.3 million, clean water. June 17, 2019. This project includes design engineering and property acquisition for an offline storage tunnel, pump station, and major appurtenances to be constructed between the Ballard and Wallingford Combined Sewer Overflow (CSO)…
- Construction of a New Biosolids Management Facility: Washougal city of-Public Works. $22.6 million, clean water. March 10, 2025. This project improves water quality in the Columbia River through the construction of a biosolids management facility at the Wastewater Treatment Plant in the city of Washougal (City). This project will construct an…
- Clean Water Preservation - Phase 1: Pasco, City of. $22.3 million, clean water, $750,000 in grants and forgiven principal. Feb. 18, 2022. This project improves water quality in the Columbia River through the construction of the RECIPIENT's Wastewater Treatment Facility by replacing components of the plant that have exceeded their useful life and…
- Cheney Purple Pipe Project: Cheney, City of. $21.8 million, clean water. May 13, 2022. This project improves water quality in the Spokane River basin and West Plains groundwater through the construction of a water reclamation distribution system from the RECIPIENT?s Water Reclamation Facility. This…
- City of Lynden WWTP Expansion Project ? Stage 2 MLE Retrofit: Lynden, City of. $18.4 million, clean water. April 30, 2025. This project improves water quality in the Nooksack River through construction of improvements to the City of Lynden?s (RECIPIENT) existing wastewater treatment plant (WWTP). This project will increase capacity,…
- Critical WWTP Improvements/Influent Screening and Conveyance Project: Aberdeen,City of. $17.8 million, clean water. July 1, 2022. This project improves water quality in the Grays Harbor through the construction of (1) repairs to the leaking roof of the anaerobic digester (to seal existing leaks and significantly reduce the potential for…
- City of Wenatchee Digester Project: Wenatchee, City of. $17.0 million, clean water. Feb. 25, 2022. This project improves water quality in the Columbia River through the construction of wastewater treatment facilities at the wastewater treatment plant in the City of Wenatchee. This project improves digestion of…
- West Sequim Bay Corridor Sewer Extension & Lift Station Construction: Sequim, City of. $16.0 million, clean water, $1.3 million in grants and forgiven principal. June 30, 2025. The West Sequim Bay Corridor Sewer Extension and Lift Station project, in the City of Sequim, improves water quality in Sequim Bay through the construction of a wastewater collection system extension to extend the…
- Gooseberry Point WWTF Improvements Construction: Lummi Tribal Sewer and Water District. $14.9 million, clean water, $780,000 in grants and forgiven principal. June 17, 2020. This project will protect water quality and fish/shellfish habitat in Hales Passage by upgrading components of the Gooseberry Point Wastewater Treatment Plant (WWTP). Upgrades per the approved design will allow the…
- West Point Treatment Plant Raw Sewage Pump Replacement: King County Dept. of Nat. Resources and Parks. $14.9 million, clean water. June 30, 2024. This project preserves water quality in Elliott Bay by designing needed improvements at the West Point Treatment Plant in King County. Replacement pumps for existing raw sewage pumps were installed in 1966 and were…
Counties that received the most
- King: $456 million
- Franklin: $103 million
- Whatcom: $72.5 million
- Spokane: $71.4 million
- Thurston: $63.0 million
- Kitsap: $57.6 million
- Walla Walla: $53.7 million
- Clark: $41.7 million
- Benton: $37.1 million
- Grant: $36.7 million
Every project, with filters, a map and a table, is on this page in the app. Source: EPA State Revolving Fund public records, through June 30, 2025.