Vermont
Where the state’s revolving fund money for water went, project by project.
$277 million committed to 336 drinking water and clean water projects.
- Drinking water: $148 million
- Clean water: $129 million
- Grants and forgiven principal: $107 million
- Latest agreement: June 9, 2025
The 25 largest projects
- WWTPs Upgrades Project: Burlington, City of. $15.9 million, clean water, $950,000 in grants and forgiven principal. Sept. 6, 2019. This project loan is for the construction of headworks improvements for the 3 WWTFs in the City. The loan amount consolidates the planning loans as well.
- Pleasant Valley Water Treatment Facility Upgrade: Town of Brattleboro, Brattleboro. $14.5 million, drinking water, $7.3 million in grants and forgiven principal. Sept. 3, 2020. Replacement of the existing water treatment facility. New facility will include an additional filter, refurbishment of existing filters, upgrades to SCADA and instrumentation, replacement of chemical feed components,…
- Water Treatment Plant Improvements: Saint Johnsbury, Town of, St Johnsbury. $12.4 million, drinking water, $7.6 million in grants and forgiven principal. June 12, 2023. Construction of a new water treatment facility building with ultrafiltration membrane equipment and modification of the existing treatment facility to be used for pretreatment.
- Town of Bennington Lead Service Lines Replacement Project: Bennington, Town of, Bennington. $10.6 million, drinking water, $10.6 million in grants and forgiven principal. Aug. 10, 2020. Identification and replacement of lead-containing service lines throughout the town. Contract 1 (Phase 1): replacement of 140 service connections along Branch Street, County Street, Division Street, Gage Street, Maple…
- WWTF Upgrade, Contract #2: Hinesburg, Town of. $9.3 million, clean water, $1.9 million in grants and forgiven principal. Sept. 23, 2021. RF1-301-2.0: This is for Contract No. 2 - WWTF Upgrade which is scheduled to start construction in November 2022, and is required to comply with the new Discharge Permit Limits. RF1-301-3.0: This Loan is for the…
- Swanton Wastewater Treatment Facility: Swanton, Village of. $7.7 million, clean water, $936,000 in grants and forgiven principal. July 22, 2019. This project is the construction of the WWTF Upgrade, which includes phosphorus removal improvements. It also consolidates all of the planning loans for this project.
- BVCWS Wastewater System Upgrade: Bolton Valley Community Water and Sewer, LLC. $7.7 million, clean water. May 3, 2021. This loan is for the construction of the Wastewater System Upgrade project. It consolidates all planning loan costs as well.
- Replace storage tanks, Rte 12 main, and service lines: Northfield, Town of, Northfield. $7.2 million, drinking water, $3.6 million in grants and forgiven principal. Dec. 11, 2024. Replacement of Rte 12 main, service lines including some with lead goosenecks, and replacement of existing storage tanks with new Cheney Tank. To fund a supplement to 2005 Preliminary Engineering Report; project…
- Bennington WWTF Refurbishment: Bennington, Town of. $5.9 million, clean water, $96,000 in grants and forgiven principal. Jan. 25, 2017. This loan is for the construction phase of the WWTF Refurbishment Project and includes consolidation of the previously issued preliminary engineering loan amount of $32,400 and the final design engineering loan of…
- New Storage Tank for Filtered Water: Champlain Water District, South Burlington. $5.5 million, drinking water. Sept. 30, 2024. Installation of a 1.0 million gallon precast prestressed concrete water storage tank to replace an existing 1.0 million gallon glass fused to steel tank.
- Water System Expansion Project Phase II: South Alburgh Fire District #2, Alburgh. $5.3 million, drinking water, $2.6 million in grants and forgiven principal. Oct. 19, 2020. Water system extension to serve approximately 90 service connections on Point of Tongue Rd; Wagner Point Rd; Macomber Rd; and Poor Farm Rd, Middle Rd Ext, and Rte 2 between them. The system will include 46,600 feet of…
- Service lines, mains, and meters: Dorset Fire District 1, Dorset. $5.0 million, drinking water, $1.9 million in grants and forgiven principal. Oct. 8, 2022. Replacement of service lines, water mains, and installation of district metering.
- WWTFs Refurbishment: Whitingham, Town of. $3.9 million, clean water, $1.6 million in grants and forgiven principal. Dec. 5, 2018. This loan is for the final design costs for the Towns two WWTFs. The preliminary engineering loan is being consolidated into this loan as well.
- Water Storage Tank: Alburgh, Village of, Alburgh. $3.8 million, drinking water, $1.9 million in grants and forgiven principal. April 12, 2021. New elevated steel water storage tank, demolition of old tank, construction of water main loop, and improvements at treatment facility to enable tank to be taken out of service for maintenance.
- Water Treatment Facility Upgrades: Royalton Town Fire District #1, South Royalton. $3.8 million, drinking water, $2.8 million in grants and forgiven principal. June 6, 2022. Construction of water treatment facility upgrades including building expansion, new clarifier unit, new finished water storage tank.
- Malletts Bay Sewer Project: Colchester, Town of. $3.8 million, clean water, $250,000 in grants and forgiven principal. Oct. 23, 2018. This loan is for the final design and construction costs for this project which includes new sewers in Malletts Bay on East and West Lakeshore Drive and Goodsell Point. Sewer will be discharged to existing Town…
- WWTF RBC Replacement Project: Bennington, Town of. $3.6 million, clean water, $304,000 in grants and forgiven principal. Aug. 13, 2018. This project loan is for the replacement of the Rotating Biological Contactor equipment at the Bennington WWTF. This project will be managed by the Town and they will perform the RBC installation with Town staff. This…
- LSLGEN Mains and services lines Contract I incl Bridge, Franklin, Wall, Mill, others: Springfield, Town of, Springfield. $3.4 million, drinking water, $1.7 million in grants and forgiven principal. June 2, 2025. Contract I includes approximately 2,900' of new 12" and 8" waterline from Bridge St to Main St, 1000' of new 8" waterline on Bridge St, and 1,500' of 8" replacement waterlines on Franklin and Wall St, and Mill Rd.
- Gravity Pipe Assessment: Burlington, City of. $3.3 million, clean water, $789,000 in grants and forgiven principal. Jan. 24, 2017. This construction loan is for the sanitary and combined wastewater piping infrastructure refurbishment project. There is one planning loan that is resulting in 2 construction loans. (this one, one for the stormwater…
- Wastewater Treatment Facility Upgrade: Hardwick, Town of. $3.2 million, clean water, $891,000 in grants and forgiven principal. Oct. 7, 2021. This loan is for the construction of a project that is the replacement of the floating cover and lagoon liner, as well as sludge cleanout and addressing other age related needs.
- Aldis Hill Storage Tank: Saint Albans, City of, St Albans. $3.0 million, drinking water, $1.5 million in grants and forgiven principal. Nov. 10, 2020. New 1.2 MG concrete storage tank.
- Wastewater Systems Replacement: Vernon Advent Christian Homes, Inc.. $2.9 million, clean water. June 27, 2022. This construction loan is for the project that will replace the existing wastewater system. It consolidates the planning loans for the preliminary engineering and final design engineering for the project as well.
- Pleasant St. & Gilman Ave. Area Water, Sewer & Storm Improvements: Saint Johnsbury, Town of, St Johnsbury. $2.8 million, drinking water, $2.1 million in grants and forgiven principal. April 30, 2021. Replacement of approximately 8,500 linear feet of aged and undersized water main with appurtenances including fittings, valves, and fire hydrants in the Pleasant Street and Gilman Avenue area.
- South Woodstock WWTF Upgrade: Woodstock, Town of. $2.8 million, clean water, $140,000 in grants and forgiven principal. July 21, 2020. The construction loan is for the South Woodstock WWTF refurbishment project. It is being cofunded with PC Grant VT-362.
- WWTF Upgrade: Ludlow, Village of. $2.6 million, clean water, $100,000 in grants and forgiven principal. March 12, 2019. This project loan is to cover the costs of the Villages WWTF Upgrade Project Planning and a requisite Hydraulic and Hydrologic Study to address flood resiliency for the new design. The project includes a new influent…
Counties that received the most
- Chittenden: $58.9 million
- Bennington: $33.8 million
- Windham: $25.1 million
- Windsor: $24.7 million
- Caledonia: $22.0 million
- Washington: $16.4 million
- Franklin: $14.9 million
- Rutland: $13.4 million
- Grand Isle: $9.4 million
- Addison: $7.1 million
Every project, with filters, a map and a table, is on this page in the app. Source: EPA State Revolving Fund public records, through June 30, 2025.