Texas
Where the state’s revolving fund money for water went, project by project.
$2.6 billion committed to 245 drinking water and clean water projects.
- Drinking water: $901 million
- Clean water: $1.7 billion
- Grants and forgiven principal: $319 million
- Latest agreement: June 27, 2025
The 25 largest projects
- Walnut Branch WWTP Abandonment and Expansion of Geronimo Creek WWTP: Seguin. $183 million, clean water. March 23, 2023. The City proposes to demolish the 5 million-gallons-per-day (MGD) Walnut Branch WWTP and expand and upgrade the Geronimo Creek WWTP from 2.13 to 12 MGD. The Walnut Branch WWTP waste stream will be transferred to the…
- Citywide Sanitary Sewer Collection System Rehabilitation: Houston. $130 million, clean water. Dec. 21, 2021. Construction - The project performs sanitary sewer rehabilitation and replacement through various techniques, principally sliplining, pipebursting and cured-in-place methods, and includes sanitary sewer cleaning and…
- 8.0 MGD Wilbarger Creek Regional Wastewater Treatment Facility& 54-inch Wastewater Interceptor: Pflugerville. $123 million, clean water. Feb. 7, 2024. The City proposes to construct a second wastewater treatment plant with a capacity of 8 MGD. In January 2020 afinal permit was approved for the proposed new plant. The City proposes to construct a new interceptor for…
- John Hargrove Environmental Complex (JHEC) WRF Expansion: Pearland. $75.0 million, clean water. April 1, 2021. Planning Design & Construction - Project Description: The City is requesting planning, design, and construction funds for expansion of the John Hargrove WRF from four million-gallon per day (MGD) average daily flow to…
- Village Creek Water Reclamation Facility (VCWRF) Primary Clarifiers 1-12 Replacement & Improvement: Fort Worth. $59.0 million, clean water. Sept. 19, 2024. The City proposes to replace twelve 80-foot primary clarifiers with three 190 foot clarifiers. The new clarifiers will be larger and more efficient than the existing clarifiers and increase the rated capacity. This…
- Riverbend Regional Water System: Riverbend Water Resources, New Boston. $55.8 million, drinking water. Feb. 24, 2022. P A D & Construction - Description: Riverbend Water Resources District would serve as the lead funding sponsor for the project and regional wholesale water provider. The project consists of constructing a new raw water…
- Lumberton MUD - WWTP Expansion: Lumberton MUD. $44.0 million, clean water. Sept. 20, 2022. Construction - The District is proposing to construct a new 6.0 MGD WWTP at the site of the existing plant. The new plant will consist of two 3.0 MGD treatment trains with reuse of limited equipment from the existing…
- Water Distribution System Improvements (5 Year): Dallas, Dallas. $44.0 million, drinking water. May 18, 2022. Design & Construction - The City of Dallas will utilize DWSRF funds to construct multiple segments of small diameter water main (less than 20-inch) replacements totaling nearly 40 miles/year.
- Water Distribution System Improvements (5 Year): Dallas, Dallas. $44.0 million, drinking water. May 19, 2021. Design & Construction - The City of Dallas will utilize DWSRF funds to construct multiple segments of small diameter water main (less than 20-inch) replacements totaling nearly 40 miles/year.
- Surface Water Treatment Plant Expansion: New Braunfels, New Braunfels. $40.0 million, drinking water. Sept. 23, 2022. Planning Design & Construction - March 2021 The City proposes to expand its existing 8 million-gallons-per-day (MGD) water treatment plant to 16 MGD. To protect the SWTP from flooding the improvements will include…
- Guadalupe Valley Hydroelectric System (GVHS): Guadalupe Blanco RA. $40.0 million, clean water. Dec. 8, 2021. Planning Design & Construction - The Authority proposes to replace existing bear-trap style crest gates with new hydraulically actuated steel crest gates at Lake Dunlap, TP-3 (Lake McQueeney), and TP-4 (Lake Placid)…
- Guadalupe Valley Hydroelectric System (GVHS): Guadalupe Blanco RA. $40.0 million, clean water. Jan. 14, 2021. Planning Design & Construction - The Authority proposes to replace existing bear-trap style crest gates with new hydraulically actuated steel crest gates at Lake Dunlap, TP-3 (Lake McQueeney), and TP-4 (Lake Placid)…
- Buffalo Creek Interceptor Tunnel: North Texas MWD. $39.6 million, clean water, $1.0 million in grants and forgiven principal. May 26, 2022. Construction - The District proposes to construct approximately 10,300 linear feet of 72-inch gravity interceptor line between the western side of Kaufman County and the eastern side of Dallas County, crossing the East…
- Sister Grove Regional Water Resource Recovery Facility Phases I and II: North Texas MWD. $37.9 million, clean water. May 22, 2025. A critical NTMWD wastewater service area that is experiencing very rapid growth is its Upper East Fork Interceptor System (UEFIS) service area. Current UEFIS service areas are conveyed to two existing regional…
- Rowlett Creek Regional Wastewater Treatment Plant Expansion Plant: North Texas MWD. $37.6 million, clean water. Feb. 25, 2021. Construction - The Districts Upper East Fork Interceptor System collects and conveys wastewater to two of its regional wastewater treatment plants the Wilson Creek RWWTP and the Rowlett Creek RWWTP. The Districts…
- Riverbend Regional Water System: Riverbend Water Resources, New Boston. $37.2 million, drinking water. Feb. 24, 2022. P A D & Construction - Description: Riverbend Water Resources District would serve as the lead funding sponsor for the project and regional wholesale water provider. The project consists of constructing a new raw water…
- Water System Improvements: Sharyland WSC, Mission. $35.9 million, drinking water, $10.0 million in grants and forgiven principal. July 22, 2024. Construction - The proposed project includes the relocation of approximately 26.5 miles of waterlines at segments Nos. 5, 6, 8, 10, 11, and 12. It also includes improvements to WTPs Nos. 1 and 2 to improve function,…
- Wastewater Treatment Plant & Collection Improvements Denton: Pilot Point. $34.5 million, clean water, $75,000 in grants and forgiven principal. Aug. 10, 2023. Planning Design & Construction - The City is proposing to use financing for planning, design, and construction costs for wastewater infrastructure improvements. New WWTP facilities will be built on adjacent to land…
- 8.0 MGD Wilbarger Creek Regional Wastewater Treatment Facility& 54-inch Wastewater Interceptor: Pflugerville. $31.1 million, clean water. Aug. 25, 2022. The City proposes to construct a second wastewater treatment plant with a capacity of 8 MGD. In January 2020 afinal permit was approved for the proposed new plant. The City proposes to construct a new interceptor for…
- Guadalupe Valley Hydroelectric System (GVHS): Guadalupe Blanco RA. $30.9 million, clean water. Feb. 10, 2022. Planning Design & Construction - The Authority proposes to replace existing bear-trap style crest gates with new hydraulically actuated steel crest gates at Lake Dunlap, TP-3 (Lake McQueeney), and TP-4 (Lake Placid)…
- North Austin Reservoir & Pump Station Replacement: Austin, Austin. $30.0 million, drinking water. Nov. 17, 2021. Construction - At the City?s North Austin Reservoir, the City proposes to decommission existing infrastructure and construct a new facility that will include a new 8-million-gallon ground storage tank and a pump…
- Wastewater Treatment 20-Year Improvements: Edinburg. $29.7 million, clean water, $75,000 in grants and forgiven principal. March 16, 2023. P A D & Construction - The proposed project has three phases. Phase one includes necessary improvements to the WWTP to meet all permit parameters at a flow of 13.5 MGD. Phases two and three will be implemented…
- Conversion to Advanced Metering Infrastructure (AMI): Amarillo. $29.5 million, clean water, $1.0 million in grants and forgiven principal. Aug. 11, 2020. Construction - Description: The City of Amarillo proposes to convert the meter system to Advanced Metering Infrastructure (AMI), a type of fixed infrastructure technology. The incorporation of an AMI system into the…
- Aledo WWTP Expansion: Aledo. $27.8 million, clean water. April 3, 2025. Planning Design & Construction - The proposed project will construct treatment plant improvements, including installation new fine screen, lift station pumps, sequencing batch reactors, post-equalization basin, cloth…
- Hitchcock Collection System Improvements Project: Hitchcock. $27.3 million, clean water, $3.4 million in grants and forgiven principal. Dec. 12, 2024. Description: The City of Hitchcock is required to remediate sanitary sewer overflows (SSO) caused by various sources of inflow and infiltration (I/I) into the wastewater collection system. This project will repair or…
Counties that received the most
- Guadalupe: $336 million
- Travis: $177 million
- Dallas: $132 million
- Harris: $130 million
- Bowie: $115 million
- Tarrant: $75.6 million
- Collin: $75.5 million
- Brazoria: $75.3 million
- Hidalgo: $73.5 million
- Matagorda: $70.6 million