Tennessee
Where the state’s revolving fund money for water went, project by project.
$609 million committed to 123 drinking water and clean water projects.
- Drinking water: $197 million
- Clean water: $412 million
- Grants and forgiven principal: $54.9 million
- Latest agreement: June 23, 2025
The 25 largest projects
- New WWTP/Advanced Treatment: Springfield. $37.0 million, clean water. Aug. 19, 2024. Construction of a new 7.0 MGD WWTP to include a new biological treatment system, influent pump stations, headworks, activated sludge treatment, and sludge digestion/management.
- New Water Treatment Plant: Oak Ridge, Oak Ridge. $30.0 million, drinking water. July 26, 2022. Construction of a new 16 MGD membrane filtration water treatment plant.
- Collection System Replacements and Inflow and Infiltration Correction: Springfield. $25.7 million, clean water. Nov. 26, 2018. Collection System Replacement (Installation of approximately 18,000 LF of 8-inch to 24-inch diameter sewer lines and 75 new manholes to address SSOs)and I/I Correction (Rehabilitation of approximately 3,900 LF of…
- WWTP Improvements/ Advanced Treatment: HamiltonCoWWTA. $24.0 million, clean water. Oct. 2, 2024. Improvements to the WWTP to include the installation of a new headworks with screens and grit removal; advanced primary clarification; new solids handling equipment and chlorine disinfection; electrical improvements;…
- New Water Treatment Plant: Oak Ridge, Oak Ridge. $20.0 million, drinking water. May 14, 2024. Construction of a new 16 MGD membrane filtration water treatment plant.
- I/I Correction: Chattanooga. $20.0 million, clean water. Oct. 9, 2023. Wet Weather Storage, Phase 6-Construction of a 5 MG EQ basin, 10 MGD Hixson pump station, a 20 MGD submersible dry-weather pump station, and associated appurtenances.
- WWTP Expansion/Advanced Treatment: Franklin. $19.5 million, clean water. Oct. 25, 2021. Expansion of the existing WWTP from 12MGD to 16MGD to include new headworks, EQ basin, and UV disinfection system; modifying the biological nutrient system and denitrification filters; and biosolids and hydraulic…
- WWTP Improvements and I/I Correction: Chattanooga. $19.0 million, clean water. Feb. 23, 2022. This project will consist of rehabilitating approximately 1,600 linear feet (LF) of existing 30-inch diameter force main from the Citico Pump Station crossing underneath to the other side of the Tennessee River. The…
- GREEN - WWTP Improvements/Secondary Treatment: Dayton. $18.1 million, clean water. Oct. 25, 2021. Construction of a SBR and headworks with fine screening and grit removal, chemical building, septic receiving station, sludge facility, effluent pump/electrical building, and operations building; conversion of existing…
- Water Treatment Plant Expansion and Improvements: Cookeville, Cookeville. $17.5 million, drinking water. April 26, 2022. Expansion of the existing water treatment plant, including addition of a new filter building with eight filters, flocculation basin, sedimentation basins, expanding chlorine building, electrical improvements, and other…
- WWTP Expansion: Smyrna. $17.2 million, clean water. Jan. 25, 2021. Expanding the WWTP from 5.8 MGD to 9 MGD to include advanced biological treatment, secondary clarification, and tertiary filtration; upgrades to the UV disinfection, aeration, and solids dewatering system; and…
- New Wastewater Treatment Plant: Brownsville Energy Authority. $17.0 million, clean water, $5.0 million in grants and forgiven principal. June 23, 2025. Construction of a new 2.0 MGD SBR to replace the existing Trickling Filter Plant.
- New Water Treatment Plant: Clifton, Clifton. $15.9 million, drinking water, $10.2 million in grants and forgiven principal. April 10, 2025. Construction of a 1.5 MGD WTP to include a new raw water intake and 2,500 LF of waterline from the intake to the WTP site.
- Waterline Replacement: Fayetteville, Fayetteville. $15.2 million, drinking water, $7.5 million in grants and forgiven principal. Nov. 29, 2023. Waterline Replacement: Replacement of approximately 83,000 LF of aging waterlines to improve pressure and reduce water loss.
- New Project: Fayetteville, Fayetteville. $15.0 million, drinking water. May 1, 2025. Replacement of approximately 83,000 LF of aging waterline to improve pressure and reduce water loss
- New Interceptor: Lakeland. $15.0 million, clean water. Oct. 19, 2022. Replacing the existing Clear Creek Interceptor with a new interceptor.
- WWTP Improvements and I/I Correction: Chattanooga. $15.0 million, clean water. Nov. 24, 2020. This project will consist of rehabilitating approximately 1,600 linear feet (LF) of existing 30-inch diameter force main from the Citico Pump Station crossing underneath to the other side of the Tennessee River. The…
- I/I Correction: Memphis. $15.0 million, clean water. Feb. 17, 2021. Group 2 CIPP/Group 2 Relay to include pre-cleaning, rehabilitation of approximately 35,000 LF of 8-inch thru 24-inch diameter sewer lines by methods of CIPP and point repairs; and manhole rehabilitation; and replacing…
- Lower Brush Creek Sewer Interceptor Replacement: Johnson City. $12.7 million, clean water. Dec. 13, 2019. Providing all construction, supervision, labor, materials, tools, and test equipment necessary for installing approximately 21,000 linear feet of 42-inch gravity sewer line from E Mallard Street to the Brush Creek…
- GREEN - WWTP Improvements/Secondary Treatment: Dayton. $12.5 million, clean water, $2.5 million in grants and forgiven principal. April 26, 2023. Construction of a SBR and headworks with fine screening and grit removal, chemical building, septic receiving station, sludge facility, effluent pump/electrical building, and operations building; conversion of existing…
- WWTP Upgrades/Expansion: White House. $12.4 million, clean water. Dec. 14, 2020. This project includes expanding and upgrading the existing wastewater treatment plant (WWTP) by adding a new treatment train. The new treatment train will consist of a grit removal facility, a new 2.0 million gallon…
- WWTP Expansion-Secondary Treatment: Thompson's Station. $10.4 million, clean water. July 26, 2022. Expansion of the existing WWTP from 0.47 MGD to 1.0 MGD. Construction Loan
- New WWTP/Advanced Treatment: Springfield. $10.0 million, clean water, $5.0 million in grants and forgiven principal. Aug. 19, 2024. Construction of a new 7.0 MGD WWTP to include a new biological treatment system, influent pump stations, headworks, activated sludge treatment, and sludge digestion/management.
- I/I Correction: Cleveland. $10.0 million, clean water. Sept. 21, 2020. SSES of approximately 107,000 LF of sewer lines in Sewer Basin 64-14A and the rehabilitation of sewer lines and manholes by method of CIPP, trenchless, and manhole lining in Sewer Basin 10A-8.
- New Interceptor: Lakeland. $9.0 million, clean water. Sept. 21, 2023. Replacing the existing Clear Creek Interceptor with a new interceptor.
Counties that received the most
- Robertson: $98.4 million
- Hamilton: $78.5 million
- Anderson: $56.7 million
- Shelby: $39.0 million
- Lincoln: $36.4 million
- Rhea: $35.2 million
- Williamson: $34.9 million
- Bradley: $27.9 million
- Rutherford: $26.5 million
- Putnam: $23.0 million
Every project, with filters, a map and a table, is on this page in the app. Source: EPA State Revolving Fund public records, through June 30, 2025.