South Dakota
Where the state’s revolving fund money for water went, project by project.
$1.6 billion committed to 368 drinking water and clean water projects.
- Drinking water: $763 million
- Clean water: $873 million
- Grants and forgiven principal: $74.7 million
- Latest agreement: June 5, 2025
The 25 largest projects
- Water Reclamation Facility Phase III: Sioux Falls. $123 million, clean water. Jan. 5, 2022. The project includes improvements to the influent flow equalization, headworks facilities, primary clarifier facilities, aeration basin, final clarifiers, return activated sludge (RAS) and waste activated sludge (WAS)…
- South Plant Water Reclamation Facility Improvement: Rapid City. $102 million, clean water. Dec. 9, 2022. Rapid City proposes to build out the South Plant with the addition of secondary clarifiers and hydraulic improvements which will allow the South Plant to assume all of the inflow while meeting permit limits. This…
- Treatment Plant, Distribution, and Storage Improvements: Shared Resources, Dell Rapids. $70.0 million, drinking water. May 10, 2024. Shared Resources is a joint effort between Minnehaha Community Water Corporation (MCWC) and the Big Sioux Community Water System (BSCWS). The project scope includes an 8-MGD treatment plant, well field, distribution…
- Pump Station 240 Capacity Improvements: Sioux Falls. $61.0 million, clean water. March 15, 2024. The City of Sioux Falls Pump Station (PS) 240 is at or near capacity and additional capacity is necessary to meet future growth. The City plans to increase the PS capacity in multiple phases. Phases completed in…
- Water Treatment Facility: Brookings, Brookings. $51.0 million, drinking water. Dec. 20, 2022. The City of Brooking intends to upgrade the water systems facilities in multiple phases. Phase one, includes the construction of a new 6 MGD lime softening Water Treatment Facility along 34th Avenue. The new treatment…
- Regional Waterline Upgrade: Randall Community Water District, Lake Andes. $45.0 million, drinking water. April 25, 2025. Randall CWD is proposing a project to address increasing demand among existing customers as well as supply water to the City of Mitchell. The project will consist of 200,000 feet of 20-inch HDPE pipe from the 4.5MG…
- Water Treatment Facility: Brookings, Brookings. $40.7 million, drinking water. Sept. 10, 2024. The City of Brooking intends to upgrade the water systems facilities in multiple phases. Phase one, includes the construction of a new 6 MGD lime softening Water Treatment Facility along 34th Avenue. The new treatment…
- Regional Waterline Upgrade: Randall Community Water District, Lake Andes. $38.7 million, drinking water. Nov. 22, 2024. Randall CWD is proposing a project to address increasing demand among existing customers as well as supply water to the City of Mitchell. The project will consist of 200,000 feet of 20-inch HDPE pipe from the 4.5MG…
- Water Treatment Plant: Yankton, Yankton. $37.0 million, drinking water. March 9, 2018. Construction of a 5-million gallon per day water treatment facility using reverse osmosis.
- Wastewater treatment Facility: Aberdeen. $32.4 million, clean water. Nov. 15, 2024. The city of Aberdeen is proposing to increase the capacity and expand the operations of their Wastewater Treatment Facility to handle increasing amounts of wastewater. They plan on improving the main lift station,…
- Wastewater treatment Facility (Additional Funding): Aberdeen. $30.0 million, clean water. March 27, 2025. The city of Aberdeen is proposing to increase the capacity and expand the operations of their Wastewater Treatment Facility to handle increasing amounts of wastewater. They plan on improving the main lift station,…
- Water System Improvements: Mid-Dakota Rural Water System, Miller. $29.5 million, drinking water. Sept. 15, 2023. Mid-Dakota Rural Water System is proposing to update the existing water system by installing a new advanced metering infrastructure system for water meters, paralleling of pipe, addition of a new backwash recovery…
- Wastewater Collection and Treatment Improvements: Watertown. $25.0 million, clean water. July 30, 2024. Watertown proposes to construct improvements to wastewater collection and treatment systems that have reached the end of their useful life. This project will include replacement of the final clarifier and improvements…
- Wastewater Treatment Plant Improvements: Yankton. $23.3 million, clean water. May 23, 2024. The City of Yankton proposes improvements to its existing wastewater treatment plant. The improvements will allow the treatment plant to meet existing and future flows and anticipated regulatory requirements. The…
- Basin 15 Sewer Extention Phase 2A and 2B: Sioux Falls. $23.1 million, clean water. July 15, 2024. Sioux Falls is proposing Phases 2A and 2B of the Basin 15 Sanitary Sewer project. Phase 1 is already underway in the area near Ellis Road and 12th Street. Phase 2 will connect to the stopping point of Phase 1 and…
- 2022 System Improvement Project: Kingbrook Rural Water System, Arlington. $22.9 million, drinking water. June 16, 2023. Kingbrook Rural Water System has a number of existing facilities that are operating beyond its firm capacity and need to be replaced or improved. These include the Badger Pump Station, DeSmet Water Treatment Plant,…
- Wastewater Collection and Treatment Improvements: Watertown. $19.8 million, clean water. Sept. 7, 2023. Watertown proposes to construct improvements to wastewater collection and treatment systems that have reached the end of their useful life. This project will include replacement of the final clarifier and improvements…
- System Wide Improvements: Tripp County Water Users District, Winner. $18.8 million, drinking water. Dec. 28, 2023. Tripp County Water Users District (TCWUD) is proposing to improve the entire water infrastructure. To improve its storage, they propose to replace two storage tanks that are currently beyond their service life. TCWUD…
- Water Reclamation Facility Expansion: Sioux Falls. $18.5 million, clean water. Dec. 23, 2020. The project includes improvements to the influent flow equalization, headworks facilities, primary clarifier facilities, aeration basin, final clarifiers, return activated sludge (RAS) and waste activated sludge (WAS)…
- Basin 15 Sewer Expansion<br>;<br> Big Sioux River Watershed: Sioux Falls. $18.0 million, clean water. Oct. 30, 2023. The City of Sioux Falls continues to grow west of Ellis Road. There is a need for new trunk line near 12th Street (SD Hwy 42) and Ellis Road to accommodate future needs. Basin 15 is located northwest of the current…
- Mitchell Wastewater Treatment Facilities Improvements<br>;<br> Wastewater Treatment Facilities Improvements - NPS: Mitchell. $17.7 million, clean water. Oct. 5, 2022. The project consists of major upgrades to the North plant of Mitchell's Wastewater Treatment Facility. The improvements proposed will include construction of a new headworks facility for screening and grit removal,…
- Water System Improvements Project: Mitchell, Mitchell. $16.0 million, drinking water, $1.0 million in grants and forgiven principal. Oct. 11, 2023. Project will consist of major upgrades to Mitchell's drinking water system. The primary components of the project will include construction of a 2.5 million gallon capacity ground storage tank and associated pump…
- Wastewater Treatment Facility Improvements: Pierre. $15.3 million, clean water. May 27, 2021. Pierre is proposing to construct Phase I of a two-phase wastewater treatment system improvement project. The work includes a new submersible lift station, influent pumping and solids-screening upgrades, modifications…
- Wastewater Pretreatment Improvements Phase 1: Huron. $14.9 million, clean water. Jan. 13, 2021. Huron proposes to construct new sequencing batch reactors (SBR) and abandon the existing ones, as well as rehabilitate the pretreatment building. The current SBRs are undersized for current demands and cannot provide…
- Wastewater Treatment Facility Improvements Phase 2: Mitchell. $12.9 million, clean water. Nov. 5, 2024. The City of Mitchell is applying for additional funds for its south wastewater treatment facility improvement project. The need for extra financing is due to a substantial rise in construction costs since the original…
Counties that received the most
- Minnehaha: $281 million
- Brookings: $143 million
- Pennington: $134 million
- Moody: $130 million
- Charles Mix: $97.9 million
- Yankton: $79.2 million
- Brown: $69.2 million
- Davison: $68.3 million
- Codington: $57.6 million
- Lincoln: $50.1 million
Every project, with filters, a map and a table, is on this page in the app. Source: EPA State Revolving Fund public records, through June 30, 2025.
All states · About the data · New Hampshire concept · Consul, Inc.