North Dakota
Where the state’s revolving fund money for water went, project by project.
$936 million committed to 209 drinking water and clean water projects.
- Drinking water: $363 million
- Clean water: $573 million
- Grants and forgiven principal: $99.1 million
- Latest agreement: June 27, 2025
The 25 largest projects
- Wastewater Treatment Facility Improvements: Fargo. $152 million, clean water, $4.3 million in grants and forgiven principal. April 26, 2018. Construction to expand the current wastewater treatment facility to accommodate growth, regionalization, and future regulations. The project will include a new west treatment train, influent pumping, preliminary…
- Water Treatment Plant Replacement: City of Grand Forks, Grand Forks. $66.0 million, drinking water. April 10, 2017. This project replaces the existing water treatment plant that was originally built in the 1950s.
- WWTF Phase 1 Improvements: Grand Forks. $54.6 million, clean water. Dec. 27, 2022. Process and capacity improvements including piping routes, mechanical and egress improvements, septage reception, and solids handling. In addition, bioreactors will be expanded and improved for new capacity. Future…
- Stormwater Lift Station Upgrades: Metro Flood Diversion Authority. $51.6 million, clean water. Oct. 19, 2022. The project will upgrade 16 storm lift stations throughout the City of Fargo, which are required components of the comprehensive flood protection for the Fargo/Moorhead metro area.
- Bismarck Hay Creek Lift Station, Forcemain, and Sewer Interceptor: Bismarck. $45.0 million, clean water. July 31, 2023. Project includes the replacement of the existing Hay Creek Interceptor, construction of a new Hay Creek Lift Station and gravity sewer, and construction of a new forcemain from the lift station to existing sewer along…
- Water Tower, WTP Improvements, Regionalization, and Source Water Improvement: City of Fargo, Fargo. $36.0 million, drinking water. April 17, 2018. This project has multiple phases which include: a raw water resiliency project, improvements to the existing water treatment plant, regionalization efforts, and a new water tower.
- Lead Service Line Replacement: City of Fargo, Fargo. $35.0 million, drinking water, $23.6 million in grants and forgiven principal. Dec. 31, 2024. Replacement of lead service lines throughout the City of Fargo.
- CRWD-NDSP ERF and Pipeline Improvements: Cass Rural Water District. $28.6 million, clean water. March 3, 2023. The proposed project will include the construction of an effluent water reuse facility (ERF) at the Fargo Regional Water Reclamation Facility (RWRF) along with the installation of underground pipelines and the addition…
- Southwest Regional Stormwater Pond: Fargo. $26.5 million, clean water. Dec. 19, 2019. The project involves the construction of a new stormwater master facility for the area extending from 52nd Avenue South to approximately 1/4 mile south of 76th Avenue South.
- Wastewater Treatment Facility Improvements: Fargo. $21.2 million, clean water. April 26, 2018. Planning, design, and construction engineering to expand the current wastewater treatment facility to accommodate growth, regionalization and future regulations. The project will include the evaluation, design, and…
- WAWSA's 2019 Improvement and Expansion Projects: Western Area Water Supply Authority, Williston. $16.5 million, drinking water. Aug. 31, 2020. The projects include system expansion to those without rural water service, capacity expansion to existing rural service areas, and design for the next expansion of the water treatment facility. All total…
- Water Meter System Improvements: Fargo. $15.0 million, clean water. Nov. 21, 2024. The project will replace the city's current water meters with Advanced Metering.
- Memorial Highway Improvements: Mandan. $12.5 million, clean water. May 8, 2025. Water main, sanitary sewer main, storm sewer, and roadway improvements.
- Cell 21 Waste Excavation and Construction: Fargo. $10.6 million, clean water, $1.5 million in grants and forgiven principal. Sept. 25, 2023. The project involves leachate collection improvements and waste relocation.
- Maddock WTP Improvements: Central Plains Water District, Fessenden. $9.7 million, drinking water, $8.4 million in grants and forgiven principal. Jan. 15, 2024. Replacement of components past their design life, repurposing of lime softening basin for use for coagulation, and addition of aeration and RO membranes.
- Hwy 81 and Associated Areas Sanitary Sewer System: Grand Forks. $9.0 million, clean water. Sept. 18, 2023. The city is constructing a wastewater lift station, force main, and gravity collection system to serve the newly annexed area of town.
- Wastewater Treatment Facility UV Disinfection and Direct Discharge: Grand Forks. $9.0 million, clean water. Feb. 12, 2018. Project consists of direct discharge with UV at the GFWWTF and is to include: Retrofitting existing tankage for UV disinfection and the addition of a connector pipeline from the GFWWTF to the existing pond outfall.
- Hillsboro Area WTP Expansion: East Central Regional Water District, Thompson. $8.6 million, drinking water, $3.0 million in grants and forgiven principal. June 27, 2025. Construction of a water treatment plant (WTP) expansion at the existing Hillsboro WTP. This expansion will include pressure filtration and RO membranes.
- Phase 3 WTP Improvements: McLean-Sheridan Water District, Turtle Lake. $8.2 million, drinking water, $7.2 million in grants and forgiven principal. Aug. 15, 2024. Drinking water treatment plant expansion that includes additional drinking water treatment capacity, office/admin space, garage space, and chemical storage.
- Highway 81 and Associated Area Regional Stormwater Pond and Temporary Access: Grand Forks. $7.5 million, clean water. Feb. 2, 2023. Installation of a regional stormwater detention pond and associated outfall serve the stormwater needs of the newly annexed area.
- Mandan: City of Mandan, Mandan. $7.3 million, drinking water. Feb. 3, 2021. Construction of a new intake along a more stable segment of the Missouri River to provide a more stable source of water and minimize the amount of sediment that must be removed during the treatment processes.
- 2021 Assessment Job No. 1 - Storm Sewer and Sanitary Sewer Improvements: Northwood. $7.0 million, clean water, $1.4 million in grants and forgiven principal. May 27, 2021. The project will add drain tile, catch basins, manholes, storm sewer piping, storm water detention pond, and lift stations.
- Hwy 81 & Associated Area Sanitary Sewer Phase 2-5: Grand Forks. $6.9 million, clean water. Dec. 23, 2024. Install a sanitary sewer collection system to serve the areas currently on septic system.
- Memorial Highway Improvements: City of Mandan, Mandan. $6.9 million, drinking water. May 8, 2025. Water main, sanitary sewer, storm sewer, and roadway improvements.
- P 130 Watermain and Lead Service Line Replacement: City of Bismarck, Bismarck. $6.9 million, drinking water, $1.4 million in grants and forgiven principal. May 26, 2020. Watermain and lead service line replacement
Counties that received the most
- Cass: $385 million
- Grand Forks: $168 million
- Burleigh: $68.2 million
- Morton: $40.8 million
- McLean: $23.3 million
- Williams: $19.0 million
- Stutsman: $18.2 million
- Richland: $16.4 million
- Stark: $16.3 million
- Mountrail: $13.9 million
Every project, with filters, a map and a table, is on this page in the app. Source: EPA State Revolving Fund public records, through June 30, 2025.