North Carolina
Where the state’s revolving fund money for water went, project by project.
$1.9 billion committed to 314 drinking water and clean water projects.
- Drinking water: $735 million
- Clean water: $1.2 billion
- Grants and forgiven principal: $197 million
- Latest agreement: June 15, 2025
The 25 largest projects
- Southside WWTP (m'KeanMaffitt WWTP): Cape Fear Public Utility Authority. $140 million, clean water. Jan. 21, 2025. The Southside Wastewater Treatment Plant Replacement and Capacity Upgrade project will replace and expand the existing Cape Fear Public Utility Authority' s ( CFPUA) Southside Wastewater Treatment Plant WWTP) from 12…
- Sanford WFF Expansion: Sanford, City of, Sanford. $115 million, drinking water, $26.6 million in grants and forgiven principal. June 5, 2024. Expansion to a total permitted capacity of 30 MGD to provide regional water treatment solutions for the City of Sanford (20 MGD) and the Town of Fuquay-Varina (6 MGD) and the Town of Holly Springs (4 MGD). The project…
- Neuse River Water Reclamation Facility: Clayton, Town of. $110 million, clean water. Sept. 9, 2020. Replacement of 2.5 MGD Little Creek WWRF with a new 10 MGD Neuse River WRF, and infrastructure required to redirect wastewater flow to the new site
- Rehabilitation (without expansion) of the Nielson WTP: Winston-Salem, City of, Pfafftown. $100 million, drinking water. Dec. 18, 2018. Rehabilitation (without expansion) of the Nielson WTP
- WWTF 4 MGD Expansion: Johnston County. $91.7 million, clean water. June 2, 2021. 4MGD expansion of Central Johnston County Regional WWF and decommission some of oldest infrastructure
- WWTP Improvements: Graham, City of. $83.0 million, clean water, $1.5 million in grants and forgiven principal. Sept. 29, 2022. Expansion of existing wastewater treatment plant from 3.5MGD to 5.0 MGD
- Wilkesboro Cub Creek WWTP Expansion: Wilkesboro, Town of. $69.6 million, clean water, $1.0 million in grants and forgiven principal. March 4, 2023. WWTP expansion from 4.9 to 9 MGD.
- Sanford WFF Expansion: Fuquay-Varina, Town of, Fuquay-varina. $54.0 million, drinking water. April 16, 2024. Expansion of Sanford WTP from 12 MGD to 30 MGD in a joint venture with the Town of Holly Springs and the City of Sanford. The Town of Fuquay-Varina is funding 6 MGD. This project includes: Replacement of the Raw Water…
- Kerr Lake Regional Water Treatment Plant: Henderson, City of, Henderson. $42.8 million, drinking water. Sept. 26, 2022. Expansion of the water treatment plant capacity from 10 MGD to 20 MGD and enhancement of the treatment processes including the replacement of existing clarification system with a high-rate clarification system…
- Water Transmission Improvements Project.: Davie County, Mocksville. $41.1 million, drinking water, $2.0 million in grants and forgiven principal. April 25, 2023. Davie County owns and operates the 2.6- mgd Cooleemee WTP in southern Davie County. The Town of Mocksville owns the 2.0- mgd Hugh A. Lagle WTP is the Town's only WTP. Both water treatment facilities are at the end of…
- Water Treatment Plant Upgrade / Phase I: Greenville Utilities Commission, Greenville. $40.0 million, drinking water. Sept. 18, 2020. Increasing WTP capacity from 22.3 to 32 MGD
- Wastewater Treatment System Improvements: Sanford, City of. $37.1 million, clean water, $500,000 in grants and forgiven principal. Oct. 14, 2022. Decommissioning of the existing Pittsboro WWTP activated sludge reactor and clarifier system and sludge thickening basins with conversion of existing tankages and basins to a combined equalization volume of…
- Big Rockfish Creek Sanitary Sewer Outfall: Fayetteville, City of. $31.2 million, clean water. June 7, 2021. Installation of 33,000 LF 18-inch and 24-inch gravity sewer
- Expand and connect to the Shallotte WWTP: Brunswick County. $29.8 million, clean water. Feb. 18, 2022. Sewer force main from South Port to West Regional Brunswick Co WWTP and a .75 MGD expansion of the Shallotte WWTP.
- Wastewater Treatment Plant Improvements: Waynesville, Town of. $29.4 million, clean water, $500,000 in grants and forgiven principal. Feb. 2, 2021. - Rehabilitation of WWTP including replacement of headworks, primary clarifiers; rehabilitation of intermediate pump station, aeration basins, blowers; installation of secondary clarifiers; improvements to disinfection…
- LRWWTP Solids Handling Improvements: Lexington, City of. $28.0 million, clean water, $500,000 in grants and forgiven principal. July 23, 2024. This project will replace existing solids handling equipment and provide redundancy/ resiliency so the WWTP can continue to provide reliable service that aligns with projected influent flows and solids production.…
- Raw-Water Supply Facilities Replacement and Relocation: Hendersonville, City of, Hendersonville. $23.5 million, drinking water. Aug. 19, 2020. Replace/Relocate Mills River Raw-Water Intake via Installation of New 21 MGD Intake & 12-MGD, Raw-Water Pump Station on French Broad River
- Sugar Creek WWTP Reliability Improvements Project: Charlotte, City of. $20.9 million, clean water. April 13, 2017. Rehabilitation of Sugar Creek WWTP to include aeration basin improvements (replacing diffusers, new influent distribution box, modify zoning), rehabilitation and/or replacement of blowers, pumps at the main PS, sluice…
- Subaqueous Sanitary Sewer Replacement Wastewater Collection System Improvements: Lake Lure, Town of. $19.6 million, clean water, $500,000 in grants and forgiven principal. March 10, 2022. Collection System Installation of a sewer access valve at the Lake Lure dam. Phase 1 replacement of the existing Lake Lure subaqueous sanitary sewer collection system with a Backshore Gravity/Lift Station system,…
- Compost Facility Upgrade: Shelby, City of. $19.3 million, clean water. Sept. 9, 2015. ER Amendment alters project from a Composting Facility to a new Dewatering Building, Anaerobic Digester with Belt-Filter Press facility at the First Broad River. Originally: This Composting Facility ER and P&S were…
- Chin Page Road Pump Station: Durham, County of. $19.3 million, clean water. Jan. 10, 2025. The proposed project replaces the existing Chin Page Road Pump Station (>20 years old) and approximately 5,300 LF of sewer pipe (>40 years old) with larger sewer pipe and a larger pump station outside the Stirrup Iron…
- Big Rockfish Sanitary Sewer Outfall-Lift Station Elimination: Fayetteville, City of. $18.4 million, clean water. Jan. 14, 2021. Installation of a new 3.5 MG EQ facility to include a 12.5 MGD PS, 1,100 LF of 24-inch FM, a 3.5 MG storage tank, and 550 LF of 36-inch gravity sewer.
- P.O. Hoffer Water Treatment Plant (WTP) & Glenville Lake WTP Reliability Improvements Project: Fayetteville Public Water Commission, Fayetteville. $15.7 million, drinking water. Jan. 7, 2022. Project to include: A) At the P.O. Hoffer WTP: 1) Replace air-burst system compressor (for cleaning the raw-water intake screens); 2) Replace powdered activated-carbon system for treatment of raw water; 3) Install new…
- East Davie Wastewater Collection System: Davie County. $15.4 million, clean water. Jan. 16, 2019. Yadkin River Pump Station Reverse flow and reduction in capacity by replacement of two (2) 1,286 gpm pumps with two (2) 610 gpm; and installation of approximately 4,700 LF of 8-inch force main. Smith Creek Pump Station…
- Sewer Upgrades: Gastonia, City of. $15.4 million, clean water. June 4, 2021. Installation of 28,100 LF of 8-inch to 48-inch gravity sewer, two pump stations (Armstrong Ford and South East) , 15,035 LF of 18-inch to 20-inch force main, two odor control stations, and abandonment of two pump…
Counties that received the most
- Johnston: $225 million
- New Hanover: $175 million
- Lee: $116 million
- Forsyth: $108 million
- Alamance: $85.2 million
- Wake: $79.8 million
- Wilkes: $78.4 million
- Davie: $60.4 million
- Cumberland: $59.0 million
- Pitt: $55.4 million
Every project, with filters, a map and a table, is on this page in the app. Source: EPA State Revolving Fund public records, through June 30, 2025.