Montana
Where the state’s revolving fund money for water went, project by project.
$437 million committed to 172 drinking water and clean water projects.
- Drinking water: $182 million
- Clean water: $255 million
- Grants and forgiven principal: $58.9 million
- Latest agreement: June 25, 2025
The 25 largest projects
- West Yellowstone WWTP Improvements: West Yellowstone. $15.8 million, clean water, $750,000 in grants and forgiven principal. May 29, 2024. Construct a new mechanical treatment plant with headworks, anaerobic, anoxic, and oxic treatment basins, clarifiers, digesters, and dewatering facilities.
- City of Polson Water Resource Recovery Facility: Polson, City of. $14.9 million, clean water, $400,000 in grants and forgiven principal. June 15, 2017. Replacement of the existing lagoon with a sequencing batch reactor (SBR), with headworks building and ultraviolet disinfection and biosolids handling.
- Bozeman Davis Lane/Norton East Ranch Sewer: Bozeman, City of. $14.8 million, clean water, $300,000 in grants and forgiven principal. July 22, 2020. Construction of the Norton East Ranch gravity sewer and Davis Lane lift station and construction of the force main from the new lift station to the WRF. The project includes a microtunnel of I90, Montana Rail Link, and…
- Kalispell West Side Interceptor: Kalispell, City of. $12.6 million, clean water, $400,000 in grants and forgiven principal. July 19, 2018. Install about 10,000 feet of gravity and pressure sewer pipe, install lift station, remove two lift stations. Will reduce pipe flow in other city system.
- Missoula Water Main and Meter Replacement Project: Missoula, City of, Missoula. $12.5 million, drinking water. April 27, 2022. Project consists of fifteen separate main replacement projects in the City of Missoula and a system-wide replacement of meters.
- Townsend Water Improvements: Townsend, City of, Townsend. $12.2 million, drinking water, $5.0 million in grants and forgiven principal. March 19, 2025. New elevated water storage tank and transmission main. Replace valves and fire hydrants. Improvements to three water supply wells.
- Four Corners WWTP: Four Corners W & S District. $11.6 million, clean water, $300,000 in grants and forgiven principal. Aug. 27, 2019. onstruct a new influent lift station, headworks facility, SBR basins, aerobic digesters, solids dewatering building, blower room, electical room, laboratory/office space, UV disinfection. Water and sewer mains, site…
- Livingston WRF: Livingston, City of. $11.5 million, clean water, $400,000 in grants and forgiven principal. Feb. 7, 2018. Upgrade to SBR
- Kalispell Tank and Wells Project: Kalispell, City of, Kalispell. $11.0 million, drinking water, $1.0 million in grants and forgiven principal. July 27, 2023. Install a new 1 million gallon elevated water storage tank, complete and connect three previously drilled wells with well houses, disinfection and controls.
- Belgrade WRF Upgrade: Belgrade, City of. $11.0 million, clean water. July 21, 2021. Upgrade to increase trunk main and WWTF treatment capacity. Project includes new headworks facility, oxidation ditch, IP bed, and solids storage lagoons.
- City of Whitefish Source and Treatment Expansion Project (PWSID No. MT0000357): Whitefish, City of, Whitefish. $11.0 million, drinking water. Sept. 23, 2020. Expansion of City of Whitefish's surface water source capacity and surface water treatment plant.
- Whitefish WWTF Improvements 2020: Whitefish, City of. $10.3 million, clean water, $350,000 in grants and forgiven principal. May 5, 2020. grading of Existing Partial Aerated Lagoon Facility to Aqua Aerobics Aqua Nereda System.
- Kalispell Tank and Wells Project: Kalispell, City of, Kalispell. $8.9 million, drinking water. Feb. 2, 2024. Install a new 1 million gallon elevated water storage tank, complete and connect three previously drilled wells with well houses, disinfection and controls.
- Kalispell LPZ Tank No. 1 Replacement: Kalispell, City of, Kalispell. $7.9 million, drinking water, $3.9 million in grants and forgiven principal. Dec. 10, 2024. Replace LPZ Tank No 1 with new 2.5 million gallon concrete tank
- Whitefish WWTF Improvements 2020: Whitefish, City of. $7.8 million, clean water. Nov. 19, 2020. grading of Existing Partial Aerated Lagoon Facility to Aqua Aerobics Aqua Nereda System.
- New Project: East Helena, City of. $6.9 million, clean water, $850,000 in grants and forgiven principal. June 12, 2025. Schedule 1 CIPP rehabilitation approximately 5,600 linear feet of the collection system. Schedule 2 includes replacing headworks facility and influent pump station at the City's wastewater treatment plant.
- Miles City UV Disinfection & Solids Handling: Miles City, MT. $6.6 million, clean water, $400,000 in grants and forgiven principal. Sept. 21, 2016. City adding new UV system along with new solids digester, solids dewatering facility and other associated appurtenances.
- Belgrade WRF Upgrade: Belgrade, City of. $6.3 million, clean water, $350,000 in grants and forgiven principal. Jan. 26, 2022. Upgrade to increase trunk main and WWTF treatment capacity. Project includes new headworks facility, oxidation ditch, IP bed, and solids storage lagoons.
- Belgrade WRF Upgrade: Belgrade, City of. $6.2 million, clean water. June 27, 2023. Upgrade to increase trunk main and WWTF treatment capacity. Project includes new headworks facility, oxidation ditch, IP bed, and solids storage lagoons.
- Glendive - Water Treatment Plant Improvements Project: Glendive, City of, Glendive. $6.1 million, drinking water. Dec. 16, 2020. Install new solids contact building with two new solids contact basins, new electrical room, new chemical feed equipment, upgrade process control equipment, new air scour equipment and all associated piping and…
- Belgrade WRF Upgrade: Belgrade, City of. $5.9 million, clean water. April 15, 2021. Upgrade to increase trunk main and WWTF treatment capacity. Project includes new headworks facility, oxidation ditch, IP bed, and solids storage lagoons.
- Lockwood W&S District Filter Train Addition: Lockwood Water and Sewer District, Billings. $5.8 million, drinking water. May 25, 2021. Treatment plant does not meet redundancy requirements with existing filters. Project will install a third and fourth filter train to meet current requirements.
- Bigfork Water & Sewer District Water Storage Tank Project: Bigfork County Water & Sewer District, Bigfork. $5.4 million, drinking water, $500,000 in grants and forgiven principal. March 9, 2022. The district will construct a new 750,000 gallon water storage tank (changed to 1.0 MG tank from DN through pre-selection) with associated transmission line.
- Lewistown Disinfection & Water System Improvements: Lewistown, City of, Lewistown. $5.2 million, drinking water, $750,000 in grants and forgiven principal. June 27, 2023. AOC to provide disinfection by December 2022. Proposed disinfection of Big Springs source; booster chlorination at lower pump station and castle ridge booster station; valves and pumps at lower pump station; 6th avenue…
- Townsend WWTP Improvements: Townsend, City of. $5.0 million, clean water, $400,000 in grants and forgiven principal. Jan. 31, 2019. Replacement of influent lift station, sewer main rehabilitation (cured-in-place-pipe (CIPP)), lagoon sludge removal with land application, lagoon aeration system replacement, new headworks building, and ultraviolet…
Counties that received the most
- Flathead: $77.0 million
- Gallatin: $75.1 million
- Missoula: $38.4 million
- Lake: $18.7 million
- Lewis and Clark: $18.5 million
- Broadwater: $17.2 million
- Dawson: $13.6 million
- Meagher: $12.5 million
- Richland: $11.2 million
- Big Horn: $10.3 million
Every project, with filters, a map and a table, is on this page in the app. Source: EPA State Revolving Fund public records, through June 30, 2025.