Mississippi
Where the state’s revolving fund money for water went, project by project.
$726 million committed to 151 drinking water and clean water projects.
- Drinking water: $378 million
- Clean water: $348 million
- Grants and forgiven principal: $262 million
- Latest agreement: June 30, 2025
The 25 largest projects
- DCRUA Project #15: DeSoto County Regional UA. $45.3 million, clean water. Sept. 30, 2024. Construction of the 11 MGD Horn Lake Basin influent pump station, approximately 39,750 lf of force main, and related appurtenances to conect the Horn Lake Creek Basin Interceptor Sewer District to the Johnson Creek…
- New Activated Sludge Plant: Greenwood. $38.6 million, clean water. Sept. 28, 2012. Construct a sequence batch reacto WWTF, with headworks to include an influent pump statiion, screening, grit removal, influent flow measurement, aeration basin, two clarifiers, three return activated sludge pump…
- DCRUA Loan #14: DeSoto County Regional UA. $36.8 million, clean water. Sept. 30, 2024. Construction of a 2 MGD Center Hill water reclamation facility (WRF) to serve the eastern part of the county along with a combination of pump stations (both influent and effluent) and force mains to the Center Hill WRF…
- Bond Debt Purchase: Jackson, City of, Jackson. $34.9 million, drinking water, $34.9 million in grants and forgiven principal. Nov. 8, 2024. Bond Debt Purchase for 2013 City of Jackson Obligation Bond for Siemens Water Meter Project
- OB Curtis Resilient Power Facilities: Jackson, City of, Jackson. $31.8 million, drinking water, $31.8 million in grants and forgiven principal. March 24, 2025. OB Curtis Power Resiliency Facilities
- OBC Curtis Residuals System Upgrades: Jackson, City of, Jackson. $28.4 million, drinking water, $28.4 million in grants and forgiven principal. June 30, 2025. The existing solids system will be optimized by splitting the residuals based on their source and improving existing infrastructure. Backwash and reject flows from both the membrane and conventional filters will be…
- Treatment Plant Upgrades & Rehabs, Water Distribution Improvements: Jackson, City of, Jackson. $28.0 million, drinking water, $4.6 million in grants and forgiven principal. Sept. 30, 2021. Treatment Plant Upgrades & Rehabilitation, Distribution Improvements
- Savanna Wastewater Treatment Plant Improvements: Phase 1: Jackson. $26.8 million, clean water. Sept. 28, 2018. Phase 1 (Type 2) Improvements at the Savanna Wastewater Treatment Plant, which includes: the rehabilitation/upgrade of various components of the influent pump station, grit removal system, anoxic basin, final…
- Greenville Loan 12: Greenville. $21.2 million, clean water. Sept. 25, 2020. Sewer system rehabilitation including CIPP of much pipe throughout the city's collection and transmission system.
- Emergency Distribution System Optimization: Jackson, City of, Jackson. $19.8 million, drinking water, $19.8 million in grants and forgiven principal. Nov. 8, 2024. Material purchase for Emergency Distribution System Optimization that includes the Colonial Golf Course 48-inch Main, the 20-inch Mains on Fortification and Prentiss, and the Northside Drive Water Main.
- Metro WWTF Upgrades and Lower Camp Creek Canal Interceptor: DeSoto County Regional UA. $18.8 million, clean water. Sept. 30, 2020. Upgrade of the Metro WWTF from 0.537 MGD to 1 MGD and the construction of the Lower Camp Creek Interceptor, which is approximately 22,241 LF of 30 inch to 36 inch gravity sewer.
- OB Curtis Pump/Motor Rehab & Replacement: Jackson, City of, Jackson. $15.0 million, drinking water, $15.0 million in grants and forgiven principal. March 24, 2025. OB Curtis Raw Water Pumps and Motors Rehab and Replacement
- Greenville 767-10: Greenville. $14.9 million, clean water. Sept. 28, 2018. Rehabilitation of existing grit chamber, sludge lagoon, collection and transmission system.
- SCADA System Improvements: Jackson, City of, Jackson. $13.4 million, drinking water, $13.4 million in grants and forgiven principal. Nov. 8, 2024. SCADA System Improvements
- Iron Removal Treatment Upgrades: Grenada, City of, Grenada. $10.3 million, drinking water, $500,000 in grants and forgiven principal. Sept. 30, 2019. This project proposes to construct a 3,000gpm treatment plant and two 800gpm treatment plants with associated appurtenances for the removal of iron and manganese.
- WWTF Upgrades and Rehab: Cleveland. $9.7 million, clean water. Sept. 30, 2020. Improvements to the existing influent pump station, rehabilitation of the existing lagoon levee system, upgrades to the existing spray field and spray field application station, and all related appurtenances.
- Treatment Plant Improvements: Jackson, City of, Jackson. $9.0 million, drinking water, $500,000 in grants and forgiven principal. Sept. 30, 2019. The purpose of this project is to provide water treatment plant improvements as well as water distribution improvements.
- Sanitary Sewer System Improvements: Greenville. $8.3 million, clean water. Sept. 30, 2019. At the wastewater treatment plant, the work includes the improvements at the influent pump station (dry pit submersible pump and standby pump), Effluent pump station (cascade mixed flow propeller pump and standby…
- Natchez Water Works 852-03: Natchez. $8.2 million, clean water. Sept. 30, 2022. Improvements at the POTW, includes upgrades of the clarifiers, replacement of the existing aerated grit system, the aeration diffuser sleeves/mixing improvements, digester blower, installation of a mechanical bar…
- Wastewater System Improvements: West Jackson County UD. $7.6 million, clean water. Sept. 30, 2014. Replacement of two (2) pump stations, 2,804 linear feet of 12 inch gravity sewer, 3,498 linear feet of 10 inch gravity sewer, 23,855 linear feet of 8 inch gravity sewer, and 3,000 linear feet of 6 inch gravity sewer.…
- Treament Plant Upgrades and Component Replacements: Jackson, City of, Jackson. $7.3 million, drinking water, $500,000 in grants and forgiven principal. Sept. 30, 2016. Convert Lime to Soda Ash for Corrosion Control, Replace Membranes, Raw Water Screens, Microscreens, Sluice Gates, Centrifuges, and a New Finished Water Control Valve at the OB Curtis Treatment Plant
- Small Pipe Diameter Replacement: Jackson, City of, Jackson. $7.2 million, drinking water, $7.2 million in grants and forgiven principal. March 24, 2025. Small pipe diameter replacement project with larger diameter lines in the Choctaw Village area.
- New Wells: Meridian, City of, Meridian. $6.7 million, drinking water, $4.6 million in grants and forgiven principal. Sept. 30, 2024. Two new 1,400-GPM water wells with appurtenances and transmission mains from the wells to the water treatment plant.
- JCUA Sewer System Improvements: Jackson County UA. $6.3 million, clean water. Sept. 30, 2019. Relocation of the existing Pump Station No.6 with a new inline booster station and installation of 2,300 LF of 24 inch force main; 1,800 LF of 8 inch force main extension; 1,200 LF of 12 inch gravity sewer and related…
- New Wells and Rehabilitate Treatment Plants: Meridian, City of, Meridian. $6.2 million, drinking water. Sept. 29, 2017. Treatment Plant repair and rehab of both water plants.
Counties that received the most
- Hinds: $204 million
- DeSoto: $114 million
- Washington: $45.0 million
- Leflore: $38.6 million
- Jackson: $38.1 million
- Rankin: $34.3 million
- Grenada: $16.0 million
- Tishomingo: $14.5 million
- Lauderdale: $12.9 million
- Adams: $12.7 million