Missouri
Where the state’s revolving fund money for water went, project by project.
$1.8 billion committed to 355 drinking water and clean water projects.
- Drinking water: $98.2 million
- Clean water: $1.7 billion
- Grants and forgiven principal: $109 million
- Latest agreement: June 24, 2025
The 25 largest projects
- MSD FBI: Metropolitan St. Louis Sewer District. $640 million, clean water. Sept. 23, 2024. This project includes replacing the multiple hearth incinerators at both the Lemay and Bissell Point WWTF with new fluidized bed incinerators capable of meeting new air emission requirements.
- MSD FBI: Metropolitan St. Louis Sewer District. $260 million, clean water. Sept. 26, 2023. This project includes replacing the multiple hearth incinerators at both the Lemay and Bissell Point WWTF with new fluidized bed incinerators capable of meeting new air emission requirements.
- MSD Lower Meramec River System Improvements - Baumgartner to Fenton WWTF Tunnel: MSD Lower Meramec River System Improvements. $115 million, clean water. Oct. 26, 2022. Tunnel construction to convert wastewater from the Fenton WWTF to the Baumgartner tunnel.
- KCMO Blue River WWTP: Kansas City Biosolids. $100 million, clean water. April 28, 2021. The Blue River Wastewater Treatment Plant (WWTP) Biosolids Facility Project will replace and rehabilitate aging infrastructure and give the region a facility with the capacity and reliability needed to comply with…
- Lower Meramec River System Improvements - Baumgartner to Fenton WWTF Tunnel (11746): MSD Lower Meramec River System Improvements. $63.1 million, clean water. Jan. 22, 2021. Tunnel construction to convert wastewater from the Fenton WWTF to the Baumgartner tunnel.
- St. Joseph Blacksnake Creek Stormwater Separation: St. Joseph. $61.0 million, clean water. Aug. 23, 2017. constructing an approximate 1.1 mile long near surface conveyance structure, an approximate 1.25 mile long, 90-inch diameter tunnel, and improvements to the existing outfall structures which will redirect stormwater…
- Republic (WWTP MBR): Republic. $50.0 million, clean water. June 25, 2024. The project provides improvements to the treatment plant to replace aging equipment, increase treatment for anticipated effluent limits, and increase treatment capacity. Upgrades include the following: construction of…
- MSD Phase VI I/I: MSD Lemay WWTP and MSD Mo River WWTP. $41.2 million, clean water, $1.0 million in grants and forgiven principal. Jan. 22, 2021. Recipient to use SRF Grant to fund a local revolving loan fund to repair/replace failing onsite wastewater treatment systems
- MSD Bissell Fine Screens: Metropolitan St. Louis Sewer District. $27.8 million, clean water, $2.0 million in grants and forgiven principal. Aug. 22, 2023. This project consists of the abandonment of the comminutors and their replacement with dual-angle multi-rake fine screens located in a new building, and concrete and gate impr.
- Perryville Southeast WWTP: Perryville. $27.0 million, clean water, $1.0 million in grants and forgiven principal. Sept. 24, 2021. The project includes the installation of the following components: new fine screening; new grit removal and classifier equipment; one new Orbal style oxidation ditch with biological nutrient removal capabilities; two…
- The City of Rolla Wastewater Treatment Plant Upgrades: Rolla. $25.9 million, clean water. May 28, 2020. Recipient to use SRF loan to fund a upgrades to the Southeast and Vichey Road wastewater treatment systems. The Southeast improvements and modifications include replacement of existing influent screening equipment;…
- Gravois Trunk Sanitary Storage Facility: MSD Lemay WWTP and MSD Mo River WWTP. $25.2 million, clean water. Dec. 28, 2018. Recipient to use SRF loan to construct a collection system wastewater storage facility the includes two 3.9M gallon storage tanks, diversion structures, consolidation sewers, a pump station, and other required…
- City of Warrensburg WWTF: Warrensburg. $22.0 million, clean water. April 23, 2025. Using a CMAR delivery method, both facilities are to be expanded from 1.5 MGD to 2.0 MGD and peak flow of 9 MGD to 12 MGD.
- MSD Deer Creek Sanitarty Relief Pump Station: MSD of St Louis Deer Creek Sanitary Relief. $22.0 million, clean water. Sept. 15, 2020. Construct 24 MGD pump station with 6 pumps, 1 wet well, 1 wet well building, 2 dry wells, 1 dry well building, 1 effluent vault structure and site improvements.
- Higginsville-WWTF: Higginsville. $20.1 million, clean water, $3.5 million in grants and forgiven principal. March 28, 2024. The project includes construction of a new wastewater treatment facility at the city?s South Lagoon location in order to meet new permit requirements. The improvements include construction of an activated sludge…
- LBVSD - Middle Big Creek Interceptor: Little Blue Valley S.D.. $18.7 million, clean water, $750,000 in grants and forgiven principal. Dec. 9, 2024. The Little Blue Valley Sewer District Middle Big Creek Phase 2 Interceptor Extension Project will involve construction of approximately 17,100 linear feet of 36-inch diameter gravity interceptor to convey wastewater…
- Springfield Collection System I&I Improvements: Springfield. $15.0 million, clean water. March 3, 2021. Recipient to use SRF Grant to fund a local revolving loan fund Public Sewer Rehabilitation and Inflow and Infiltration Reduction: Project Group numbers 5, 6, and 7 rehabilitation work are characterized as Cured in…
- Jefferson City Biosolids: Jefferson City. $14.1 million, clean water. April 29, 2024. The project provides improvements to the city?s biosolids handling systems with a new biosolids building that includes two new sludge dewatering centrifuges, new sludge dewatering feed pumps, a polymer feed system,…
- MSD Phase IX I&I: Metropolitan St. Louis Sewer District. $14.0 million, clean water, $1.0 million in grants and forgiven principal. Sept. 23, 2024. Rehabilitation of sanitary and combined sewers and manholes using various methods including cured-in-place pipe. This program is an ongoing effort to reduce sso and cso occurrences and volumes by reducing the amount of…
- St. Joseph Water Protection Facility Energy Improvements: St. Joseph. $11.2 million, clean water, $1.5 million in grants and forgiven principal. Sept. 28, 2023. The project is continuing the development of a Biogas Optimization and Capital Reinvestment Project with Schneider Electric. The project centers on maximizing the production and use of biogas produced at the wastewater…
- MSD Phase VII I/I: MSD Lemay WWTP and MSD Mo River WWTP. $11.0 million, clean water, $1.0 million in grants and forgiven principal. Oct. 26, 2022. use SRF funds for rehabilitation of sanitary sewers and manholes using various methods, including cured in place pipe, to reduce inflow and infiltration in the district?s collection system (collection system…
- Missouri American Water Company - Jefferson City Plant Upgrades: Missouri American Water Company - Hickory Hills, Jefferson City. $10.8 million, drinking water. March 10, 2022. The project will replace the existing 0.88 million gallon (MG) clearwell and high service pumps with a new clearwell and high service pumping facility. The new facility will include a storage basin with 1.0 MG of…
- Springfield Jordan Creek: Springfield. $10.0 million, clean water, $3.5 million in grants and forgiven principal. Dec. 9, 2024. The Renew Jordan Creek Project is a stormwater conveyance and flood mitigation capital improvement project with extensive riparian restoration and green infrastructure features to improve water quality and treat…
- MSD Phase VIII I/I: Metropolitan St. Louis Sewer District. $10.0 million, clean water, $1.5 million in grants and forgiven principal. Aug. 22, 2023. Rehabilitation of sanitary and combined sewers and manholes using various methods including cured-in-place pipe. This program is an ongoing effort to reduce sso and cso occurrences and volumes by reducing the amount of…
- Aurora WWTP Improvements: Aurora. $6.7 million, clean water, $2.0 million in grants and forgiven principal. Sept. 25, 2024. The project consists of construction of a new AquaDiamond filtration system to replace the existing sand filters, renovations to screening and the overflow wall in the junction box, modifications to the sludge storage…
Counties that received the most
- Monroe: $196 million
- Jackson: $119 million
- Buchanan: $74.6 million
- Greene: $60.2 million
- Jefferson: $41.5 million
- Lafayette: $29.1 million
- St. Louis: $28.2 million
- Perry: $27.0 million
- Phelps: $26.0 million
- Johnson: $22.1 million
Every project, with filters, a map and a table, is on this page in the app. Source: EPA State Revolving Fund public records, through June 30, 2025.