Michigan
Where the state’s revolving fund money for water went, project by project.
$3.5 billion committed to 298 drinking water and clean water projects.
- Drinking water: $988 million
- Clean water: $2.5 billion
- Grants and forgiven principal: $506 million
- Latest agreement: June 26, 2025
The 25 largest projects
- Great Lakes Water Authority Water Resource Recovery Facility Aeration Decks 1 & 2 Modifications: Great Lakes Water Authority. $175 million, clean water, $20.0 million in grants and forgiven principal. May 6, 2024. The Great Lakes Water Authority Water Resource Recovery Facility Aeration Decks 1 & 2 Modifications 5838-01 project is at the wastewater treatment plant site in the southwest corner of the city of Detroit and consists…
- Great Lakes Water Authority Freud Storm Pump Station Improvements: Great Lakes Water Authority. $127 million, clean water. May 6, 2024. The Great Lakes Water Authority Freud Storm Pump Station Improvements 5708-01 project is in an eastern portion of the city of Detroit in the Jefferson-Chalmers District and consists of storm station rehabilitation,…
- Evergreen-Farmington Sanitary Drain Drainage District Long-Term Correction Action Plan Improvements: Evergreen-Farmington Sanitary Drain Drainage District. $121 million, clean water, $12.1 million in grants and forgiven principal. Jan. 20, 2023. 8 Mile Road: Modify pump station and Evergreen Sanitary Sewer Overflow chamber with new force main. Replace five pumps with four larger pumps and one standby. Upgrade electrical, structural, and mechanical. Raise…
- Redford Township Central Area Combined Sewer Overflow Retention Treatment Basin: Redford, Charter Township of. $117 million, clean water, $20.0 million in grants and forgiven principal. Sept. 6, 2024. The project contains the construction of a new combined sewer overflow retention treatment basin facility (Central Area) with screening, settling, skimming, and disinfection located at the southern portion of Roosevelt…
- GLWA - 14 Mile Road Drinking Water Transmission Main Loop Project, Phase 2 of 2: Great Lakes Water Authority, Detroit. $105 million, drinking water. Aug. 9, 2021. Approximately 42,000 lineal feet (approximately 8 miles) of new 54-inch-diameter water transmission main located primarily in cities of Novi and Farmington Hills (Oakland Co.), with a small section of pipeline in the…
- Great Lakes Water Authority (GLWA) Water Resource Recovery Facility (WRRF) Pump Station 1 (PS-1) Improvements Project: Great Lakes Water Authority. $96.0 million, clean water, $7.2 million in grants and forgiven principal. June 5, 2023. The Great Lakes Water Authority Water Resource Recovery Facility Pump Station 1 project consists of rehabilitating and rebuilding eight main lift pumps and motors, replacing valves and gates, new elbow flow meters,…
- WWTP Improvements: Delta Charter Township. $82.7 million, clean water. May 16, 2022. WWTP Major Capital Improvements
- Ann Arbor WWTP: Ann Arbor. $73.3 million, clean water. Sept. 17, 2013. Reconstruction of 10MGD West WWTP.
- City of Saline Phase 1 Wastewater Treatment Plant Improvements Project: Saline, City of. $65.0 million, clean water, $6.2 million in grants and forgiven principal. Sept. 8, 2023. The project includes new primary and secondary clarifiers with modifications to four existing clarifiers, a new headworks building with influent screening, return activated sludge pumping and blower facilities,…
- Great Lakes Water Authority Northwest Interceptor to Oakwood Combined Sewer Overflow Sewer: Great Lakes Water Authority. $60.5 million, clean water. Sept. 6, 2024. The project consists of an approximately 3,600 linear foot, 12-foot diameter mined tunnel to build a 10-foot finished diameter combined relief sewer and a permanent diversion structure in the City of Detroit?s…
- Connors Creek Sewer System Rehabilitation Project: Great Lakes Water Authority. $50.2 million, clean water. Aug. 29, 2022. The project consists of the rehabilitation of the Connors Creek Sewer System generally along Conner Street and Outer Drive in the City of Detroit from Eight Mile Road at the north end to the Connors Creek Pump Station…
- 96-inch Water Transmission Main Relocation Phase 2 Project: Great Lakes Water Authority, Detroit. $48.2 million, drinking water. July 17, 2023. This Phase 2 of the 96-inch water transmission main relocation project (Dequindre Road) consists of construction of approximately 7,985 linear feet of welded steel pipe and replacement of three culverts off Dequindre…
- Secondary Treatment Optimization: Clinton River Water Resource Recovery Facility DD. $47.9 million, clean water. Aug. 7, 2024. The project is for Phase II Secondary Treatment Optimization at the Clinton River Water Resource Recovery Facility Auburn Plant. This includes replacement of existing blowers, piping, valves, and diffusers. New return…
- New Project: Grand Ledge. $47.7 million, clean water. May 15, 2025. The City of Grand Ledge?s WWTP will be upgraded to treat 3.0 million gallons per day using an Aerobic Granular Sludge process followed by tertiary filtration to meet the proposed treatment goals and hydraulic capacity…
- Flint: Flint. $46.7 million, clean water. Aug. 16, 2024. Force main rehab, interceptor replacement, transformer replacement, and demolition of the Avon Pump Station.
- Belding Wastewater System Improvements: Belding. $46.0 million, clean water, $18.5 million in grants and forgiven principal. Aug. 28, 2023. Wastewater Treatment Facility: Construction of a 1.2 Million Gallon per Day (MGD) average daily flow, 4.1 MGD peak hourly flow, facility located on Wells Road, north of the existing lagoons. The facility will include a…
- Clinton River Water Resource Recovery Facility Improvements Project Phase I: Clinton River Water Resource Recovery Facility DD. $44.8 million, clean water, $3.8 million in grants and forgiven principal. Sept. 20, 2023. The project includes the following electrical system improvements at the Auburn and East Boulevard facilities of the Clinton River Water Resource Recovery Facility Drainage District?s wastewater treatment plant located…
- New Project: Allendale Charter Township. $44.8 million, clean water, $3.9 million in grants and forgiven principal. Sept. 15, 2023. Contract 1: Allendale Township Water Resources Recovery Facility (WRRF) Improvements The proposed WRRF improvements will remove the primary clarifiers, rotating biological contractor treatment, and final clarifiers…
- CSO and EQ Basin Upgrades: Lansing. $44.1 million, clean water, $4.2 million in grants and forgiven principal. May 8, 2025. This project consists of a new 5-million-gallon concrete equalization basin, valves, piping, ventilation, site work, removal of the existing abandoned pump station structure below grade level, draining and removal of…
- City of Midland Wastewater System Improvements: Midland. $42.6 million, clean water. Sept. 20, 2022. The project consists of an estimated 11,260 linear feet of sanitary sewer pipe, one million gallons of new off-line storage, eliminating flow constrictions at two 90-degree pipe turns, and cured-in-place-pipe lining of…
- New Project: Genesee County. $42.1 million, clean water. Sept. 6, 2024. Kearsley Creek Interceptor Extension
- New Project: Traverse City, City of. $41.0 million, clean water. June 26, 2025. The project consists of improvements to the City of Traverse City?s Wastewater Treatment Plant involving the preliminary screening, primary treatment, headworks, and ultraviolet (UV) disinfection processes. Included in…
- WWTP Improvements: Mackinac Island, City of. $39.0 million, clean water. Aug. 8, 2023. Wastewater Treatment Plant Improvements
- Flint Water Pollution Control Facility and Third Avenue Pump Station Upgrades: Flint. $37.3 million, clean water, $9.3 million in grants and forgiven principal. Sept. 14, 2021. The project includes improvements to the Flint Water Pollution Control Facility (WPCF) and the Third Avenue Pump Station (TAPS). The WPCF projects include updates and modifications to the Waste Unloading Station,…
- Ann Arbor WWTP: Ann Arbor. $37.0 million, clean water, $2.6 million in grants and forgiven principal. April 10, 2012. Reconstruction of 10MGD West WWTP.
Counties that received the most
- Wayne: $834 million
- Oakland: $266 million
- Washtenaw: $262 million
- Genesee: $188 million
- Ingham: $176 million
- Shiawassee: $138 million
- Kent: $87.9 million
- Macomb: $85.1 million
- Eaton: $68.5 million
- Ionia: $64.1 million