Indiana
Where the state’s revolving fund money for water went, project by project.
$3.0 billion committed to 278 drinking water and clean water projects.
- Drinking water: $952 million
- Clean water: $2.0 billion
- Grants and forgiven principal: $310 million
- Latest agreement: June 30, 2025
The 25 largest projects
- WWTP Expansion Phase 1 and Collection System: Lebanon. $156 million, clean water. June 12, 2025. the WWTP Expansion Phase 1 project will increase the plant capacity to 10 MGD avg. The Collection system improvements include a Regional Lift Station, approximately 5,000 LF of 24-inch force main, and approx 11,500 LF…
- Fort Wayne 2022: Fort Wayne. $140 million, clean water. Dec. 21, 2021. Plant Improvements projects Wet Weather Ponds Improvement Project Wet Weather Pump Station Improvements project Sewer Rehabilitation Project 3RPORT and Consolidation Sewer Projects Deep Dewatering Pump Station Project…
- Citizens/ Lebanon Project: Citizens Water Authority, Indianapolis. $105 million, drinking water. Dec. 10, 2024. Design services and material procurement for multiple infrastructure projects including water transmission main extensions, booster stations, storage tanks, and water treatment plant upgrades to supply up to 25 MGD to…
- Lebanon/ CEG Phase 1: Lebanon, Lebanon. $78.7 million, drinking water. Dec. 30, 2024. Lebanon Utilities is facing an increased demand due to regional growth and requires a new water supply, along with improvements to existing infrastructure. Citizens Energy Group will supply up to 25 MGD to Lebanon in a…
- Citizen's CSO Project: Citizens (CWA). $70.5 million, clean water. Oct. 5, 2020. The project involves the continuing implementation of the DigIndy project as part of the City of Indianapolis LTCP and Consent Decree. The White River Deep Rock Tunnel The Lower Pogues Run Deep Rock Tunnel The Pleasant…
- Greenfield WWTP expansion and updage: Greenfield. $70.3 million, clean water. Sept. 19, 2022. the project will increase the average design flow rate, and replace the existing active sludge plant with a new SBR plant. The project will allow the community to address an agreed order with IDEM.
- EKPCF Expansion and Sturdy Road Lift Station Replacement: Valparaiso Municipal RWD. $62.0 million, clean water. June 20, 2024. The Valparaiso City Utilities Elden Kuehl Pollution Control Facility (EKPCF) expansion project will increase the average design flow rate from 8.0 MGD to 10.0 MGD, and the peak design flow rate from 18.0 MGD to 22.5…
- Crown Point Downtown Interceptor: Crown Point. $56.3 million, clean water. June 30, 2025. The Downtown Interceptor Project includes the construction of approx 17,700 LF of gravity sewer and related appurtenances to provide infrastructure necessary to maintain compliance with the community's CSO LTCP and…
- Citizen's Long Term Control Plan: Citizens (CWA). $52.6 million, clean water. Oct. 5, 2021. White River and Lower Pogues Run Tunnel Pleasant Run Tunnel Fall Creek Tunnel Upper Pogues Run CSO Abatement
- CSO LTCP Projects 7, 8, and 9: Huntington. $51.0 million, clean water, $2.0 million in grants and forgiven principal. Nov. 10, 2022. The projects will allow Huntington to meet the goals of the Huntington CSO LTCP.
- WTP Improvements Phase 1: Evansville, Evansville. $50.0 million, drinking water. Dec. 20, 2024. The Evansville Water and Sewer Utility existing surface water treatment plant was originally constructed in the 1870?s and has undergone multiple expansions and plant modifications. Many components are beyond the end…
- Hobart SD System and Lift Station Improvements: Hobart. $46.1 million, clean water. Sept. 14, 2022. The project will allow for better transportation of effluent from the Hobart SD to the Gary SD in wet weather events.
- Fort Wayne Water Utility Improvements: Fort Wayne, Fort Wayne. $44.6 million, drinking water, $80,000 in grants and forgiven principal. Dec. 15, 2021. The proposed project includes: ? Improvements, equipment, and system upgrades to the Three Rivers Filtration Plant ? Replacement of the program logic controllers at the St Joseph Dam ? The extension of water service…
- Peru Utilities WWTP Project: Peru. $41.9 million, clean water, $2.6 million in grants and forgiven principal. June 6, 2024. The proposed project will address aging wastewater treatment infrastructure and allow for treatment of peak wet weather flows in compliance with Peru Utilities? Long-Term Control Plan. The project includes improvements…
- Wansford Lift Station: Evansville. $39.6 million, clean water. May 4, 2023. The project will replace the deficient and aging Pfeiffer Road lift station with a new Wansford Lift Station. The project is included in the Evansville Integrated Overflow Control Plan and will eliminate SSOs in the…
- Elkhart CSO Storage: Elkhart. $38.5 million, clean water. Nov. 20, 2024. The project includes the construction of a new CSO storage tank and pumping facility, associated force main, and separation of combined sewers. These projects are included in Elkhart's CSO LTCP.
- Wastewater System Improvement: Bluffton. $36.9 million, clean water, $2.0 million in grants and forgiven principal. May 25, 2023. The project will extend sewer service to areas served by failing septic systems and improve the collection system and wastewater treatment plant to optimize conveyance, reduce inflow/ infiltration into the collection…
- Cumberland: Cumberland. $35.3 million, clean water. Oct. 3, 2024. The proposed project includes: ?Expansion of the existing Town of Cumberland WPCF 1.5 MGD to 3.0 MGD ?Decommissioning and demolition of the existing GEM Utilities North WWTP; ?Construction of approximately 50 LF of…
- Fort Wayne 2023: Fort Wayne. $35.0 million, clean water, $500,000 in grants and forgiven principal. Sept. 25, 2023. The project includes the following control measures from the Fort Wayne CSO LTCP: -Foster Park relief sewer Phase I, II, and III -South Foster pump station -3RPORT Deep dewatering pump station -Buchanan St Sewer…
- Elkhart WWTP Improvements: Elkhart. $32.2 million, clean water. Sept. 15, 2021. The project will increase the primary treatment process to 60 MGD along with other associated improvements to treat additional wet weather flow as required by the City?s consent decree.
- WWTP Hydraulic Improvements and CSO 045 Equalization Basin: South Bend. $32.1 million, clean water. Nov. 29, 2023. The WWTP Hydraulic Improvements project includes: ?Eliminating the primary effluent bottleneck by providing a new open channel parallel to the existing primary effluent channel along Primary Clarifier Nos. 1-4 only and…
- Portage System Improvements: Portage. $32.0 million, clean water. March 31, 2025. Findings of the Portage AMP concluded the City's collection system and selected components at the WWTP are past useful life and need of rehab/replace. The project includes: -CIPP lining of approx 15,000 LF of sanitary…
- Pfeiffer Rd/ Wansford Lift Station: Evansville. $28.4 million, clean water. June 30, 2022. The project will replace the deficient and aging Pfeiffer Rd Lift Station with the 20MGD Wansford Lift Station.
- Bristol WWTP Improvements: Bristol. $28.3 million, clean water. June 11, 2024. While currently operating below capacity, operational problems and aging equipment are leading to inefficiencies at the existing wastewater treatment plant (WWTP). These inefficiencies have caused issues consistently…
- Sellersburg: Sellersburg. $26.1 million, clean water. March 30, 2021. The Sellersburg Project includes the improvement and expansion of WWTP to meet the needs of the community, rehabilitation of two existing lift stations, and the creation of a wastewater master plan.
Counties that received the most
- Allen: $299 million
- Marion: $273 million
- Boone: $242 million
- Lake: $238 million
- Elkhart: $169 million
- Hancock: $157 million
- Porter: $108 million
- Vanderburgh: $96.9 million
- Cass: $88.7 million
- Bartholomew: $43.7 million
Every project, with filters, a map and a table, is on this page in the app. Source: EPA State Revolving Fund public records, through June 30, 2025.