Illinois
Where the state’s revolving fund money for water went, project by project.
$4.7 billion committed to 751 drinking water and clean water projects.
- Drinking water: $2.0 billion
- Clean water: $2.7 billion
- Grants and forgiven principal: $700 million
- Latest agreement: June 30, 2025
The 25 largest projects
- FY2024 Water Main Replacement and Rehabilitation: Joliet, Joliet. $76.5 million, drinking water. March 12, 2024. The City of Joliet will be replacing approximately 31 miles of watermains ranging in size from 4 to 16inches in various locations throughout the City. This work also includes replacing fire hydrants and valves along…
- STP 2 Expansion: New Lenox. $72.6 million, clean water. June 26, 2024. Phase 1 of 3 Phase ProjectThis project will include installation of 1,634 linear feet of 54inch diameter sanitary sewer 15 manholes a preliminary treatment system which includes three influent pumps rated at 17.3 MGD,…
- Transmission Main Com Ed CorridorCalumentSag to 151st6: Oak Lawn, Oak Lawn. $66.4 million, drinking water. June 28, 2019. Installation of approximately 26,364 linear feet of 60inch diameter water main 102 linear feet of 30inch diameter water main 234 linear feet of 24inch diameter water main 112 linear feet of 16inch diameter water main…
- FY25 Watermain: Chicago, Chicago. $60.0 million, drinking water. June 30, 2025. The project is a continuation of the Citys ongoing multiyear water main replacement program. Approximately 16 miles of damaged, undersized, leaking and antiquated watermains throughout the City will be replaced.
- FY2025 Water Main Replacement and Rehabilitation: Joliet, Joliet. $60.0 million, drinking water. March 7, 2025. The City of Joliet will be installing approximately 139,035 lineal feet of watermain ranging in size from 4 to 16inches in various locations throughout the City. This work includes replacing fire hydrants, valves,…
- WWTP Improvements with Phosphorus Removal: Freeport. $59.8 million, clean water, $5.0 million in grants and forgiven principal. June 26, 2023. The project includes the construction of an enhanced biological phosphorous removal (EBPR) process and biologically active filters (BAF) at the existing WWTP. Other construction items include a new chemical feed…
- CY2021 - Sewer Lining (small diameter): Chicago. $57.9 million, clean water. May 2, 2022. Funds will be utilized for the rehabilitation of sewers by lining a total of 250,000 LF of sewers ranging in diameter between 8-inches and 60-inches (50,000 feet per contract). Pipe lining is a repair method…
- Stickney Battery A Improvements and Battery B installation of mechanical mixers: Metropolitan Water Reclamation District of Greater Chicago. $55.4 million, clean water. Dec. 30, 2024. The project consists of the rehabilitation of existing railings at the final settling tanks and influent channels the installation of mechanical mixers in the aeration tanks rehabilitation of concrete slabs over…
- CY2020 Sewer Lining: Chicago. $54.1 million, clean water. Sept. 17, 2020. Funds will be utilized for the rehabilitation of sewers by lining a total of 250,000 LF of sewers ranging in diameter between 8-inches and 60-inches (50,000 feet per contract). Pipe lining is a repair method…
- WWTP Upgrades Phase 1B, Biological Improvements: Kishwaukee Water Reclamation District. $52.6 million, clean water. June 20, 2017. The project consists of Phase IB Improvements to the District's wastewater treatment plant. Project specifics include modifying existing piping to pump to the new biological processes and flow in excess of the DMF to…
- STP Upgrade and Expansion: Pingree Grove. $51.0 million, clean water, $5.0 million in grants and forgiven principal. June 30, 2023. This project includes construction of a new wastewater treatment plant in order to double the existing daily average flow from 1.0 million gallons per day MGD to 2.0 MGD, while improving the treated effluent quality to…
- AGS Treatment Facilities for Nutrient Removal - Phase 2: Four Rivers Sanitation Authority. $49.6 million, clean water. April 10, 2023. The project consists of the installation of aerobic granular sludge facilities with four reactors, blowers, control equipment, piping, and all the necessary appurtenances. This project is for biological nutrient…
- West WRF Upgrades including Phosphorus Removal Facilities: Crest Hill. $49.5 million, clean water, $5.0 million in grants and forgiven principal. Nov. 3, 2022. The project entails improvements to the Citys West Sewage Treatment Plant STP. Activities include installing new influent pumps new mechanically cleaned screens and new grit removal facilities rehabilitation to the…
- FY2023 Water Main Rehab Replacement Project: Joliet, Joliet. $49.4 million, drinking water. April 25, 2023. The City of Joliet seeks to utilize funding from the Public Water Supply Loan Program PWSLP to replace deteriorated and undersized water mains. In addition, lead service lines within the City water distribution system…
- North Shore 1 Rehab Contract 100473S: Metropolitan Water Reclamation District of Greater Chicago. $46.3 million, clean water. Feb. 29, 2024. The project consists of the rehabilitation of the North Shore Intercepting Sewer. The District will use a combination of curedinplace pipe lining, segmental lining, andor slip lining processes, as well as opencut sewer…
- SWPP Switchgear Replacement: Chicago, Chicago. $43.6 million, drinking water. May 9, 2014. -Replacement of the obsolete electrical switchgear and distribution equipment with current technology equipment at the South Water Purification Plant. -Installation of five new diesel generators and associated control…
- Phase 1 Southeast WWTP Phosphorous Removal Upgrades: Bloomington and Normal Water Reclamation District. $43.2 million, clean water. April 8, 2024. The project consists of upgrading the processes at the Southeast Wastewater Treatment Plant for phosphorous removal. Specific activities entail the installation of chemical phosphorous removal processes additional RAS…
- General Upgrades SW STP: Urbana and Champaign Sanitary District. $43.1 million, clean water. Dec. 12, 2024. The proposed project consists of the following for the southwest treatment plant SWP to increase the flow increase the design average flow DAF plant capacity from 7.98 million gallons a day MGD to 9.2 MGD increase the…
- Phase 2A WWTF Improvements: Batavia. $38.0 million, clean water. June 9, 2023. The project entails upgrades/rehabilitation to the WWTF in order to address excess flow and odor control issues. Specific activities include construction of a bypass for the Excess Flow Clarifier, replacement of the…
- Wet Weather Treatment Facitlity; Phase 3 CSO Plan: Joliet. $37.5 million, clean water. May 2, 2017. Wet Weather pumping station Phase III CSO LTCP Imp's -Wet Weather Treatment facility.
- CY2022 Sewer Lining: Chicago. $37.5 million, clean water. June 30, 2023. With receipt of this loan, the City of Chicago will close out the final year of a mulit-year sewer lining project. Funds will be utilized for the rehabilitation of sewers by lining a total of 250,000 LF of sewers…
- STP Upgrade: Bartlett. $37.0 million, clean water. Oct. 27, 2021. The proposed project consists of modifications to the WWTP located at Stearns Road. Many upgrades to the treatment process will be completed as part of this project. The upgrades to the treatment process are as…
- Consolidate Treatment @ Regional Plant, Group II Projects: Frankfort. $36.2 million, clean water. Sept. 29, 2017. Consolidation of the North WWTP, West WWTP, and Regional WWTP into one WWTP located at the Regional WWTP location. This project will also include upgrades at the Regional WWTP location to increase treatment capacity,…
- Transmission Main from Marion Ave through Crossing CalumetSag5: Oak Lawn, Oak Lawn. $36.0 million, drinking water. April 22, 2024. This project will include the installation of approximately 15,987 linear feet of 60inch diameter water main and 46 linear feet of 24inch diameter water main along Marion Avenue, 102nd Place, and Southwest Highway.…
- PFAS Removal Phase II New WTP No. 2: North Park Water District, Machesney Park. $35.9 million, drinking water, $14.4 million in grants and forgiven principal. May 15, 2025. Construction of a water treatment plant for the removal of PFAS including a chemical feed system for fluoride and chlorine, finished pumping, water storage capacity, and approximately 3,500 feet of 20inch water…
Counties that received the most
- Cook: $964 million
- Will: $532 million
- Kane: $270 million
- DuPage: $221 million
- Winnebago: $199 million
- Stephenson: $101 million
- Lake: $91.9 million
- Adams: $90.1 million
- McHenry: $81.6 million
- DeKalb: $73.6 million
Every project, with filters, a map and a table, is on this page in the app. Source: EPA State Revolving Fund public records, through June 30, 2025.